1975•Quarterly Report of RTRIOpen access

PRACTICAL PERFORMANCE OF THE TRACK SYSTEM WITH ASPHALT TREATING METHOD

Shinnosuke Inui, Shinya UMEDA, Itaru IWASAKI

Open full text 0 citations

Abstract

Maintenance required on conventional track/ballast structures has caused Japanese National Railways to investigate ways to preserve track geometry and minimize ballast degradation. The Track System with Asphalt Treating Method was developed to be applied with a minimum of out-of-service time for the track and to prevent track subsidence while also stabilizing ballast. Asphalt is forced into the ballast beneath the ties and the ballast shoulders are paved. A slab tie must be used--these-called Large Prestressed Concrete (LPC) Slab Ties. Tests indicate stability does not decrease in the long term.

About this research paper

What this paper is about

Maintenance required on conventional track/ballast structures has caused Japanese National Railways to investigate ways to preserve track geometry and minimize ballast degradation. The Track System with Asphalt Treating Method was developed to be applied with a minimum of out-of-service time for the track and to prevent track subsidence while also stabilizing ballast. Asphalt is forced into the ballast beneath the ties and the ballast shoulders are paved. A slab tie must be used--these-called Large Prestressed Concrete (LPC) Slab Ties. Tests indicate stability does not decrease in the long term.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Maintenance required on conventional track/ballast structures has caused Japanese National Railways to investigate ways to preserve track geometry and minimize ballast degradation. The Track System with Asphalt Treating Method was developed to be applied with a minimum of out-of-service time for the track and to prevent track subsidence while also stabilizing ballast. Asphalt is forced into the ballast beneath the ties and the ballast shoulders are paved. A slab tie must be used--these-called Large Prestressed Concrete (LPC) Slab Ties. Tests indicate stability does not decrease in the long term.

Key concepts: Ballast, Track (disk drive), Slab, Asphalt, Engineering, Geotechnical engineering, Forensic engineering, Structural engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
PRACTICAL PERFORMANCE OF THE TRACK SYSTEM WITH ASPHALT TREATING METHOD — Research Paper | ScholarLens