National Dam Safety Program. Williams Dam (MO 30384), Mississippi - Kaskaskia - St. Louis Basin, Jefferson County, Missouri. Phase I Inspection Report.

Henry M Reitz, John J Bailey

Open publisher page 0 citations

Abstract

The Williams dam was inspected by an interdisciplinary team of engineers. The purpose of the inspection was to make an assessment of the general condition of the dam with respect to safety, based upon available data and visual inspection, in order to determine if the dam poses hazards to human life or property. Failure would threaten the life and property of five families and cause appreciable damage to one railroad bridge and one highway crossing. Our inspection and evaluation indicates that the dam is deficient in that the spillways do not meet the criteria set forth in the guidelines for a dam having the above size and hazard potential. Considering the small volume of water impounded, the large floodplain downstream and the five buildings downstream, one-half Probable Maximum Flood (PMF) is the appropriate spillway design flood. The probable maximum flood is defined as the flood discharge that may be expected from the most severe combination of critical meteorological and hydrologic conditions that are reasonably possible in the region. The dam will begin to be overtopped by a flood having a discharge (peak and volume) equal to 15% of the PMF. The spillways will pass a 1% chance flood (100-year flood) without overtopping, which is a flood that has a 1% chance of being exceeded in any given year.

About this research paper

What this paper is about

The Williams dam was inspected by an interdisciplinary team of engineers. The purpose of the inspection was to make an assessment of the general condition of the dam with respect to safety, based upon available data and visual inspection, in order to determine if the dam poses hazards to human life or property. Failure would threaten the life and property of five families and cause appreciable damage to one railroad bridge and one highway crossing. Our inspection and evaluation indicates that the dam is deficient in that the spillways do not meet the criteria set forth in the guidelines for a dam having the above size and hazard potential. Considering the small volume of water impounded, the large floodplain downstream and the five buildings downstream, one-half Probable Maximum Flood (PMF) is the appropriate spillway design flood. The probable maximum flood is defined as the flood discharge that may be expected from the most severe combination of critical meteorological and hydrologic conditions that are reasonably possible in the region. The dam will begin to be overtopped by a flood having a discharge (peak and volume) equal to 15% of the PMF. The spillways will pass a 1% chance flood (100-year flood) without overtopping, which is a flood that has a 1% chance of being exceeded in any given year.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The Williams dam was inspected by an interdisciplinary team of engineers. The purpose of the inspection was to make an assessment of the general condition of the dam with respect to safety, based upon available data and visual inspection, in order to determine if the dam poses hazards to human life or property. Failure would threaten the life and property of five families and cause appreciable damage to one railroad bridge and one highway crossing. Our inspection and evaluation indicates that the dam is deficient in that the spillways do not meet the criteria set forth in the guidelines for a dam having the above size and hazard potential. Considering the small volume of water impounded, the large floodplain downstream and the five buildings downstream, one-half Probable Maximum Flood (PMF) is the appropriate spillway design flood. The probable maximum flood is defined as the flood discharge that may be expected from the most severe combination of critical meteorological and hydrologic conditions that are reasonably possible in the region. The dam will begin to be overtopped by a flood having a discharge (peak and volume) equal to 15% of the PMF. The spillways will pass a 1% chance flood (100-year flood) without overtopping, which is a flood that has a 1% chance of being exceeded in any given year.

Key concepts: Spillway, Flood myth, Dam failure, Hydrology (agriculture), Floodplain, Water level, 100-year flood, Environmental science