A long-term prospective for the Spanish electricity system

Camila Fernandes, Pablo Frías, Luis Olmos, Andrés Ramos, T. Gomez

Open publisher page 2 citations

Abstract

The main objective of this paper is to present the preliminary results obtained within the SUSPLAN EU Project, regarding the integration of increasing levels of Renewable Energy Sources (RES) into the future Spanish energy system. Firstly, the optimal expansion of the Spanish electricity generation capacity from 2020 to 2050 is determined for four different storylines. Then, for each one of these storylines, a detailed analysis of the power system operation is performed for the years of 2020 and 2050. Two electricity models are used for that purpose: i) a long term generation expansion model, and ii) a medium-term system operational model. The results obtained showed that a high amount of RES generation could be integrated into the future Spanish power system but this should be accompanied with flexible generation and storage units for ensuring a secure system operation.

About this research paper

What this paper is about

The main objective of this paper is to present the preliminary results obtained within the SUSPLAN EU Project, regarding the integration of increasing levels of Renewable Energy Sources (RES) into the future Spanish energy system. Firstly, the optimal expansion of the Spanish electricity generation capacity from 2020 to 2050 is determined for four different storylines. Then, for each one of these storylines, a detailed analysis of the power system operation is performed for the years of 2020 and 2050. Two electricity models are used for that purpose: i) a long term generation expansion model, and ii) a medium-term system operational model. The results obtained showed that a high amount of RES generation could be integrated into the future Spanish power system but this should be accompanied with flexible generation and storage units for ensuring a secure system operation.

Why it matters

OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The main objective of this paper is to present the preliminary results obtained within the SUSPLAN EU Project, regarding the integration of increasing levels of Renewable Energy Sources (RES) into the future Spanish energy system. Firstly, the optimal expansion of the Spanish electricity generation capacity from 2020 to 2050 is determined for four different storylines. Then, for each one of these storylines, a detailed analysis of the power system operation is performed for the years of 2020 and 2050. Two electricity models are used for that purpose: i) a long term generation expansion model, and ii) a medium-term system operational model. The results obtained showed that a high amount of RES generation could be integrated into the future Spanish power system but this should be accompanied with flexible generation and storage units for ensuring a secure system operation.

Key concepts: Electricity system, Electricity generation, Electricity, Renewable energy, Term (time), Electric power system, Energy system, Computer science