A long-term prospective for the Spanish electricity system
Camila Fernandes, Pablo Frías, Luis Olmos, Andrés Ramos, T. Gomez
Abstract
Camila Fernandes, Pablo Frías, Luis Olmos, Andrés Ramos, T. Gomez
Abstract
The main objective of this paper is to present the preliminary results obtained within the SUSPLAN EU Project, regarding the integration of increasing levels of Renewable Energy Sources (RES) into the future Spanish energy system. Firstly, the optimal expansion of the Spanish electricity generation capacity from 2020 to 2050 is determined for four different storylines. Then, for each one of these storylines, a detailed analysis of the power system operation is performed for the years of 2020 and 2050. Two electricity models are used for that purpose: i) a long term generation expansion model, and ii) a medium-term system operational model. The results obtained showed that a high amount of RES generation could be integrated into the future Spanish power system but this should be accompanied with flexible generation and storage units for ensuring a secure system operation.
OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The main objective of this paper is to present the preliminary results obtained within the SUSPLAN EU Project, regarding the integration of increasing levels of Renewable Energy Sources (RES) into the future Spanish energy system. Firstly, the optimal expansion of the Spanish electricity generation capacity from 2020 to 2050 is determined for four different storylines. Then, for each one of these storylines, a detailed analysis of the power system operation is performed for the years of 2020 and 2050. Two electricity models are used for that purpose: i) a long term generation expansion model, and ii) a medium-term system operational model. The results obtained showed that a high amount of RES generation could be integrated into the future Spanish power system but this should be accompanied with flexible generation and storage units for ensuring a secure system operation.
Key concepts: Electricity system, Electricity generation, Electricity, Renewable energy, Term (time), Electric power system, Energy system, Computer science