2003•Geosynthetics InternationalRequires access

Time-dependent settlement analysis of a geosynthetic-reinforced soil

Sanjay Kumar Shukla, Jian‐Hua Yin

Open publisher page 10 citations

Abstract

This paper presents a mechanical modelling approach to determining the settlement of a geosynthetic-reinforced engineered granular fill–saturated soft foundation soil system. In this approach, the geosynthetic-reinforced engineered granular fill is represented by a reinforced Timoshenko beam and the saturated soft foundation soil is idealised as a Terzaghi spring–dashpot system. A parametric study has been carried out to observe the settlement response of the reinforced soil system along with the tension in the geosynthetic reinforcement at different stages of consolidation of the saturated soil.

About this research paper

What this paper is about

This paper presents a mechanical modelling approach to determining the settlement of a geosynthetic-reinforced engineered granular fill–saturated soft foundation soil system. In this approach, the geosynthetic-reinforced engineered granular fill is represented by a reinforced Timoshenko beam and the saturated soft foundation soil is idealised as a Terzaghi spring–dashpot system. A parametric study has been carried out to observe the settlement response of the reinforced soil system along with the tension in the geosynthetic reinforcement at different stages of consolidation of the saturated soil.

Why it matters

OpenAlex reports 10 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This paper presents a mechanical modelling approach to determining the settlement of a geosynthetic-reinforced engineered granular fill–saturated soft foundation soil system. In this approach, the geosynthetic-reinforced engineered granular fill is represented by a reinforced Timoshenko beam and the saturated soft foundation soil is idealised as a Terzaghi spring–dashpot system. A parametric study has been carried out to observe the settlement response of the reinforced soil system along with the tension in the geosynthetic reinforcement at different stages of consolidation of the saturated soil.

Key concepts: Terzaghi's principle, Geosynthetics, Geotechnical engineering, Consolidation (business), Settlement (finance), Foundation (evidence), Geogrid, Geology

Related papers

Back to paper searchBrowse research topicsOriginal source
Time-dependent settlement analysis of a geosynthetic-reinforced soil — Research Paper | ScholarLens