1998•AIP conference proceedingsOpen access

The Human Mars Mission: Transportation assessment

Larry Kos

Open full text 8 citations

Abstract

If funding is available, and for NASA planning purposes, the Human Mars Mission (HMM) is baselined to take place during the 2011 and 2013/2014 Mars opportunities. Two cargo flights will leave for Mars during the first opportunity, one to Mars orbit and the second to the surface, in preparation for the crew during the following opportunity. Each trans-Mars injection (TMI) stack will consist of a cargo/payload portion (currently coming in at between 65 and 78 mt) and a nuclear thermal propulsion (NTP) stage (currently coming in at between 69 and 77 mt loaded with propellant) for performing the departure ΔVs to get on to the appropriate Mars trajectories. Three 66,700 N thrust NTP engines comprise the TMI stage for each stack and perform a ΔV ranging from 3580 to 3890 m/s as required by the trajectory (with gravity losses and various performance margins added to this for the total TMI ΔV performed). This paper will discuss the current application of this NTP stage to a Human Mars mission, and project what implications a nuclear trans-Earth injection (TEI) stage as well as a bi-modal NTP stage could mean to a human visit to Mars.

Open-access reader

About this research paper

What this paper is about

If funding is available, and for NASA planning purposes, the Human Mars Mission (HMM) is baselined to take place during the 2011 and 2013/2014 Mars opportunities. Two cargo flights will leave for Mars during the first opportunity, one to Mars orbit and the second to the surface, in preparation for the crew during the following opportunity. Each trans-Mars injection (TMI) stack will consist of a cargo/payload portion (currently coming in at between 65 and 78 mt) and a nuclear thermal propulsion (NTP) stage (currently coming in at between 69 and 77 mt loaded with propellant) for performing the departure ΔVs to get on to the appropriate Mars trajectories. Three 66,700 N thrust NTP engines comprise the TMI stage for each stack and perform a ΔV ranging from 3580 to 3890 m/s as required by the trajectory (with gravity losses and various performance margins added to this for the total TMI ΔV performed). This paper will discuss the current application of this NTP stage to a Human Mars mission, and project what implications a nuclear trans-Earth injection (TEI) stage as well as a bi-modal NTP stage could mean to a human visit to Mars.

Why it matters

OpenAlex reports 8 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

If funding is available, and for NASA planning purposes, the Human Mars Mission (HMM) is baselined to take place during the 2011 and 2013/2014 Mars opportunities. Two cargo flights will leave for Mars during the first opportunity, one to Mars orbit and the second to the surface, in preparation for the crew during the following opportunity. Each trans-Mars injection (TMI) stack will consist of a cargo/payload portion (currently coming in at between 65 and 78 mt) and a nuclear thermal propulsion (NTP) stage (currently coming in at between 69 and 77 mt loaded with propellant) for performing the departure ΔVs to get on to the appropriate Mars trajectories. Three 66,700 N thrust NTP engines comprise the TMI stage for each stack and perform a ΔV ranging from 3580 to 3890 m/s as required by the trajectory (with gravity losses and various performance margins added to this for the total TMI ΔV performed). This paper will discuss the current application of this NTP stage to a Human Mars mission, and project what implications a nuclear trans-Earth injection (TEI) stage as well as a bi-modal NTP stage could mean to a human visit to Mars.

Key concepts: Mars Exploration Program, Exploration of Mars, Payload (computing), Aerospace engineering, Aeronautics, Crew, Propellant, Mars landing

Related papers

Back to paper searchBrowse research topicsOriginal source
The Human Mars Mission: Transportation assessment — Research Paper | ScholarLens