1987Middle East Oil ShowRequires access

New Techniques in Horizontal and Drainhole Drilling Optimization: Lehrte 41 Lateral Drilling Project

Bernhard Prevedel

Open publisher page 1 citations

Abstract

Abstract In order to optimize hydrocarbon recovery, more and more research work has been carried out in the last few years, especially in the field of drainhole drilling-, production-, and reservoir technology. PREUSSAG's lateral drilling project Lehrte 41 in a partly by edge water drive depleted oil reservoir can be addressed as one step further towards an increased oil production especially with respect to current oil prices. The objective of the workover operation in question was to bring the well back to an economical production by sidetracking and building up the angle of inclination to 120 deg with the Articulated Drillstring (ADS). After reaching total depth, the well was cased with standart slotted tubings and the top formation successfully cemented Oil production was resumed with a surface rod pump and showed a significant increase.

About this research paper

What this paper is about

Abstract In order to optimize hydrocarbon recovery, more and more research work has been carried out in the last few years, especially in the field of drainhole drilling-, production-, and reservoir technology. PREUSSAG's lateral drilling project Lehrte 41 in a partly by edge water drive depleted oil reservoir can be addressed as one step further towards an increased oil production especially with respect to current oil prices. The objective of the workover operation in question was to bring the well back to an economical production by sidetracking and building up the angle of inclination to 120 deg with the Articulated Drillstring (ADS). After reaching total depth, the well was cased with standart slotted tubings and the top formation successfully cemented Oil production was resumed with a surface rod pump and showed a significant increase.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Abstract In order to optimize hydrocarbon recovery, more and more research work has been carried out in the last few years, especially in the field of drainhole drilling-, production-, and reservoir technology. PREUSSAG's lateral drilling project Lehrte 41 in a partly by edge water drive depleted oil reservoir can be addressed as one step further towards an increased oil production especially with respect to current oil prices. The objective of the workover operation in question was to bring the well back to an economical production by sidetracking and building up the angle of inclination to 120 deg with the Articulated Drillstring (ADS). After reaching total depth, the well was cased with standart slotted tubings and the top formation successfully cemented Oil production was resumed with a surface rod pump and showed a significant increase.

Key concepts: Petroleum engineering, Drilling, Workover, Directional drilling, Geology, Oil drilling, Oil field, Completion (oil and gas wells)