2009•Unpublished venueRequires access

Operation of Sunset-Departure and Sunrise-Arrival Trains on Dedicated Passenger Lines

Xiaoyong Xu, Liping Min

Open publisher page 0 citations

Abstract

The feasibility of operation of sunset-departure and sunrise-arrival trains on Dedicated Passenger Lines (DPL) is discussed. The operation condition of over line sunset-departure and sunrise-arrival passenger trains and the coordinative relations with the train working diagram window is studied. The adaptability for train operation of "two lines closed simultaneously" and "one line is under maintenance while the other is on use" is emphatically analyzed. The advantage of using "rectangular segmented window" on operation sunset-departure and sunrise-arrival passenger trains with "two lines closed simultaneously" mode is stated, meanwhile, the effect of the operation of the adjacent line caused by permanent way maintenance and catenary maintenance under "one line is under maintenance while the other is on use" mode is presented. The coordination method for sunset-departure and sunrise-arrival passenger trains running on one line while the other is under maintenance is proposed. By taking the operation mode on Beijing Railway Station, the operation of over line sunset-departure and sunrise-arrival passenger trains is introduced.

About this research paper

What this paper is about

The feasibility of operation of sunset-departure and sunrise-arrival trains on Dedicated Passenger Lines (DPL) is discussed. The operation condition of over line sunset-departure and sunrise-arrival passenger trains and the coordinative relations with the train working diagram window is studied. The adaptability for train operation of "two lines closed simultaneously" and "one line is under maintenance while the other is on use" is emphatically analyzed. The advantage of using "rectangular segmented window" on operation sunset-departure and sunrise-arrival passenger trains with "two lines closed simultaneously" mode is stated, meanwhile, the effect of the operation of the adjacent line caused by permanent way maintenance and catenary maintenance under "one line is under maintenance while the other is on use" mode is presented. The coordination method for sunset-departure and sunrise-arrival passenger trains running on one line while the other is under maintenance is proposed. By taking the operation mode on Beijing Railway Station, the operation of over line sunset-departure and sunrise-arrival passenger trains is introduced.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The feasibility of operation of sunset-departure and sunrise-arrival trains on Dedicated Passenger Lines (DPL) is discussed. The operation condition of over line sunset-departure and sunrise-arrival passenger trains and the coordinative relations with the train working diagram window is studied. The adaptability for train operation of "two lines closed simultaneously" and "one line is under maintenance while the other is on use" is emphatically analyzed. The advantage of using "rectangular segmented window" on operation sunset-departure and sunrise-arrival passenger trains with "two lines closed simultaneously" mode is stated, meanwhile, the effect of the operation of the adjacent line caused by permanent way maintenance and catenary maintenance under "one line is under maintenance while the other is on use" mode is presented. The coordination method for sunset-departure and sunrise-arrival passenger trains running on one line while the other is under maintenance is proposed. By taking the operation mode on Beijing Railway Station, the operation of over line sunset-departure and sunrise-arrival passenger trains is introduced.

Key concepts: Sunrise, Sunset, Train, Catenary, Line (geometry), Mode (computer interface), Computer science, Meteorology

Related papers

Back to paper searchBrowse research topicsOriginal source
Operation of Sunset-Departure and Sunrise-Arrival Trains on Dedicated Passenger Lines — Research Paper | ScholarLens