2013Journal of Transportation Safety & SecurityRequires access

Operating Speeds from Driving Simulator Tests for Road Safety Evaluation

Francesco Bella

Open publisher page 33 citations

Abstract

Two-lane rural roads with features consistent with those required by Italian guidelines for major two-lane rural roads were implemented in a driving simulator. Twenty-nine tangent-curve-tangent configurations similar to those where a previous validation study ascertained the validity of the driving simulator for driving speed behavior research were selected. The drivers’ speeds on these configurations were processed to obtain the operating speeds. The main findings were the following. The maximum operating speed on the last 200 m of the approach tangent (V85max_200) is higher than the operating speed at the midpoint of the tangent (V85mid,t). The operating speed at the midpoint of the curve (V85mid,c) overestimates the minimum operating speed of the drivers on the curved section (V85min,c). Therefore, V85max_200 and V85min,c are the most appropriate parameters for the quantification of the speed differential as difference between the operating speeds on the approach tangent and on the successive curve. A positive correlation was found between V85max_200 and the length of the tangent whereas a negative correlation was found for the longitudinal grade. Two operating speed models for curves were obtained. Such models were validated using the speeds that were recorded by means of a Global Positioning System device on six configurations of a real two-lane rural road.

About this research paper

What this paper is about

Two-lane rural roads with features consistent with those required by Italian guidelines for major two-lane rural roads were implemented in a driving simulator. Twenty-nine tangent-curve-tangent configurations similar to those where a previous validation study ascertained the validity of the driving simulator for driving speed behavior research were selected. The drivers’ speeds on these configurations were processed to obtain the operating speeds. The main findings were the following. The maximum operating speed on the last 200 m of the approach tangent (V85max_200) is higher than the operating speed at the midpoint of the tangent (V85mid,t). The operating speed at the midpoint of the curve (V85mid,c) overestimates the minimum operating speed of the drivers on the curved section (V85min,c). Therefore, V85max_200 and V85min,c are the most appropriate parameters for the quantification of the speed differential as difference between the operating speeds on the approach tangent and on the successive curve. A positive correlation was found between V85max_200 and the length of the tangent whereas a negative correlation was found for the longitudinal grade. Two operating speed models for curves were obtained. Such models were validated using the speeds that were recorded by means of a Global Positioning System device on six configurations of a real two-lane rural road.

Why it matters

OpenAlex reports 33 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Two-lane rural roads with features consistent with those required by Italian guidelines for major two-lane rural roads were implemented in a driving simulator. Twenty-nine tangent-curve-tangent configurations similar to those where a previous validation study ascertained the validity of the driving simulator for driving speed behavior research were selected. The drivers’ speeds on these configurations were processed to obtain the operating speeds. The main findings were the following. The maximum operating speed on the last 200 m of the approach tangent (V85max_200) is higher than the operating speed at the midpoint of the tangent (V85mid,t). The operating speed at the midpoint of the curve (V85mid,c) overestimates the minimum operating speed of the drivers on the curved section (V85min,c). Therefore, V85max_200 and V85min,c are the most appropriate parameters for the quantification of the speed differential as difference between the operating speeds on the approach tangent and on the successive curve. A positive correlation was found between V85max_200 and the length of the tangent whereas a negative correlation was found for the longitudinal grade. Two operating speed models for curves were obtained. Such models were validated using the speeds that were recorded by means of a Global Positioning System device on six configurations of a real two-lane rural road.

Key concepts: Tangent, Operating speed, Driving simulator, Simulation, Midpoint, Differential (mechanical device), Mathematics, Computer science

Related papers

Back to paper searchBrowse research topicsOriginal source
Operating Speeds from Driving Simulator Tests for Road Safety Evaluation — Research Paper | ScholarLens