Analysis of Causes of Delay and Time Performance in Construction Projects

Pablo García González, Vicente A. González, Keith R. Molenaar, Francisco Orozco

Open publisher page 141 citations

Abstract

Activity delays are a common issue in the construction industry and can increase project schedules and costs. Recent research efforts have focused on the quantitative evaluation of delay impacts. The literature suggests that the construction industry is in need of additional research to systematically relate the causes of delays to their impacts. To overcome this limitation, this paper analyzes delay causes in activities that were not completed as scheduled. The paper contributes to a methodology to examine the qualitative (delay causes) and quantitative (time performance) dimensions of the delay issue. The paper proposes two indicators, as follows: (1) reason for noncompliance (RNC) as an indicator that characterizes scheduling failures, and (2) delay index (DI) as a time-performance indicator that describes the impacts of delay on critical and noncritical activities. The paper presents two building projects as case studies, with planning and subcontractors as the primary RNCs that have the greatest impact on time performance. Planning was the most harmful delay cause on time performance.

About this research paper

What this paper is about

Activity delays are a common issue in the construction industry and can increase project schedules and costs. Recent research efforts have focused on the quantitative evaluation of delay impacts. The literature suggests that the construction industry is in need of additional research to systematically relate the causes of delays to their impacts. To overcome this limitation, this paper analyzes delay causes in activities that were not completed as scheduled. The paper contributes to a methodology to examine the qualitative (delay causes) and quantitative (time performance) dimensions of the delay issue. The paper proposes two indicators, as follows: (1) reason for noncompliance (RNC) as an indicator that characterizes scheduling failures, and (2) delay index (DI) as a time-performance indicator that describes the impacts of delay on critical and noncritical activities. The paper presents two building projects as case studies, with planning and subcontractors as the primary RNCs that have the greatest impact on time performance. Planning was the most harmful delay cause on time performance.

Why it matters

OpenAlex reports 141 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Activity delays are a common issue in the construction industry and can increase project schedules and costs. Recent research efforts have focused on the quantitative evaluation of delay impacts. The literature suggests that the construction industry is in need of additional research to systematically relate the causes of delays to their impacts. To overcome this limitation, this paper analyzes delay causes in activities that were not completed as scheduled. The paper contributes to a methodology to examine the qualitative (delay causes) and quantitative (time performance) dimensions of the delay issue. The paper proposes two indicators, as follows: (1) reason for noncompliance (RNC) as an indicator that characterizes scheduling failures, and (2) delay index (DI) as a time-performance indicator that describes the impacts of delay on critical and noncritical activities. The paper presents two building projects as case studies, with planning and subcontractors as the primary RNCs that have the greatest impact on time performance. Planning was the most harmful delay cause on time performance.

Key concepts: Scheduling (production processes), Computer science, Performance indicator, Risk analysis (engineering), Construction industry, Operations research, Reliability engineering, Operations management