Analysis of Long-Term Station Blackout without automatic depressurization at Peach Bottom using MELCOR (Version 1.8)

I.K. Madni, Nuclear Regulatory Commission, Washington, DC (United States), Brookhaven National Lab., Upton, NY (United States)

Open full text 7 citations

Abstract

This report documents the results from MELCOR calculations of the Long-Term Station Blackout Accident Sequence, with failure to depressurize the reactor vessel, at the Peach Bottom (BWR Mark I) plant, and presents comparisons with Source Term Code Package calculations of the same sequence. STCP has calculated the transient out to 13.5, hours after core uncovery. Most of the MELCOR calculations presented have been carried out to between 15 and 16.7 hours after core uncovery. The results include the release of source terms to the environment. The results of several sensitivity calculations with MELCOR are also presented, which explore the impact of varying user-input modeling and timestep control parameters on the accident progression and release of source terms to the environment. Most of the calculations documented here were performed in FY1990 using MELCOR Version 1.8BC. However, the appendices also document the results of more recent calculations performed in FY1991 using MELCOR versions 1.8CZ and 1.8DNX.

About this research paper

What this paper is about

This report documents the results from MELCOR calculations of the Long-Term Station Blackout Accident Sequence, with failure to depressurize the reactor vessel, at the Peach Bottom (BWR Mark I) plant, and presents comparisons with Source Term Code Package calculations of the same sequence. STCP has calculated the transient out to 13.5, hours after core uncovery. Most of the MELCOR calculations presented have been carried out to between 15 and 16.7 hours after core uncovery. The results include the release of source terms to the environment. The results of several sensitivity calculations with MELCOR are also presented, which explore the impact of varying user-input modeling and timestep control parameters on the accident progression and release of source terms to the environment. Most of the calculations documented here were performed in FY1990 using MELCOR Version 1.8BC. However, the appendices also document the results of more recent calculations performed in FY1991 using MELCOR versions 1.8CZ and 1.8DNX.

Why it matters

OpenAlex reports 7 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This report documents the results from MELCOR calculations of the Long-Term Station Blackout Accident Sequence, with failure to depressurize the reactor vessel, at the Peach Bottom (BWR Mark I) plant, and presents comparisons with Source Term Code Package calculations of the same sequence. STCP has calculated the transient out to 13.5, hours after core uncovery. Most of the MELCOR calculations presented have been carried out to between 15 and 16.7 hours after core uncovery. The results include the release of source terms to the environment. The results of several sensitivity calculations with MELCOR are also presented, which explore the impact of varying user-input modeling and timestep control parameters on the accident progression and release of source terms to the environment. Most of the calculations documented here were performed in FY1990 using MELCOR Version 1.8BC. However, the appendices also document the results of more recent calculations performed in FY1991 using MELCOR versions 1.8CZ and 1.8DNX.

Key concepts: Blackout, Cabin pressurization, Nuclear engineering, Term (time), Environmental science, Computer science, Aerospace engineering, Engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Analysis of Long-Term Station Blackout without automatic depressurization at Peach Bottom using MELCOR (Version 1.8) — Research Paper | ScholarLens