1991International Journal of Production ResearchRequires access

Determining the number of kanbans in a multiproduct, multistage production system

Jonathan F. Bard, Boaz Golany

Open publisher page 79 citations

Abstract

Significant reductions in setup and lead times reported by the Japanese have led Western manufacturers to rethink the need for complex computer-based MRP systems. Consequently, many of these firms have adopted some form of kanban for shop floor control. In this paper, a planning model is developed to assist line managers in determining an optimal kanban policy at each workstation. The objective is to work within the capacity of the system to balance cost and service over the planning horizon. The model takes the form of a mixed integer linear program, and is solved with standard techniques. When no shortages are permitted, a number of alternative formulations are introduced that sharply reduce the computational burden. Results are presented for an example based on the assembly of printed wire boards at Texas Instruments' Austin plant.

About this research paper

What this paper is about

Significant reductions in setup and lead times reported by the Japanese have led Western manufacturers to rethink the need for complex computer-based MRP systems. Consequently, many of these firms have adopted some form of kanban for shop floor control. In this paper, a planning model is developed to assist line managers in determining an optimal kanban policy at each workstation. The objective is to work within the capacity of the system to balance cost and service over the planning horizon. The model takes the form of a mixed integer linear program, and is solved with standard techniques. When no shortages are permitted, a number of alternative formulations are introduced that sharply reduce the computational burden. Results are presented for an example based on the assembly of printed wire boards at Texas Instruments' Austin plant.

Why it matters

OpenAlex reports 79 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Significant reductions in setup and lead times reported by the Japanese have led Western manufacturers to rethink the need for complex computer-based MRP systems. Consequently, many of these firms have adopted some form of kanban for shop floor control. In this paper, a planning model is developed to assist line managers in determining an optimal kanban policy at each workstation. The objective is to work within the capacity of the system to balance cost and service over the planning horizon. The model takes the form of a mixed integer linear program, and is solved with standard techniques. When no shortages are permitted, a number of alternative formulations are introduced that sharply reduce the computational burden. Results are presented for an example based on the assembly of printed wire boards at Texas Instruments' Austin plant.

Key concepts: Kanban, Operations research, Economic shortage, Production (economics), Engineering, Service (business), Work (physics), Integer programming

Related papers

Back to paper searchBrowse research topicsOriginal source
Determining the number of kanbans in a multiproduct, multistage production system — Research Paper | ScholarLens