Taking effective delay reduction measures and using delay elements as indices for Tokyo’s metropolitan railways
Akiyoshi Yamamura
Abstract
Open-access reader
Akiyoshi Yamamura
Abstract
Open-access reader
In the Tokyo metropolitan area of Japan, several minutes of delays often happen during morning rush hour.This is because a massive number of passengers use trains for commuting.Then trains and platforms are congested.Above all, once a train delays due to increasing dwell time, the subsequent train has to wait outside a station or slow down if the platform is occupied by the preceding train.This process is repeated over and over again and delays increase more and more.So we had to identify how often or how large delays occur and take delay reduction measures, because it is pointless to blindly carry out delay reduction measures.The measures should be carried out effectively; otherwise investigations and running costs become high.In this paper, we introduce delay reduction measures and indices, which indicate the frequency of delays and the scale of delays.
OpenAlex reports 7 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
In the Tokyo metropolitan area of Japan, several minutes of delays often happen during morning rush hour.This is because a massive number of passengers use trains for commuting.Then trains and platforms are congested.Above all, once a train delays due to increasing dwell time, the subsequent train has to wait outside a station or slow down if the platform is occupied by the preceding train.This process is repeated over and over again and delays increase more and more.So we had to identify how often or how large delays occur and take delay reduction measures, because it is pointless to blindly carry out delay reduction measures.The measures should be carried out effectively; otherwise investigations and running costs become high.In this paper, we introduce delay reduction measures and indices, which indicate the frequency of delays and the scale of delays.
Key concepts: Metropolitan area, Reduction (mathematics), Transport engineering, Computer science, Engineering, Geography, Mathematics, Geometry