2014WIT transactions on the built environmentOpen access

Taking effective delay reduction measures and using delay elements as indices for Tokyo’s metropolitan railways

Akiyoshi Yamamura

Open full text 7 citations

Abstract

In the Tokyo metropolitan area of Japan, several minutes of delays often happen during morning rush hour.This is because a massive number of passengers use trains for commuting.Then trains and platforms are congested.Above all, once a train delays due to increasing dwell time, the subsequent train has to wait outside a station or slow down if the platform is occupied by the preceding train.This process is repeated over and over again and delays increase more and more.So we had to identify how often or how large delays occur and take delay reduction measures, because it is pointless to blindly carry out delay reduction measures.The measures should be carried out effectively; otherwise investigations and running costs become high.In this paper, we introduce delay reduction measures and indices, which indicate the frequency of delays and the scale of delays.

Open-access reader

About this research paper

What this paper is about

In the Tokyo metropolitan area of Japan, several minutes of delays often happen during morning rush hour.This is because a massive number of passengers use trains for commuting.Then trains and platforms are congested.Above all, once a train delays due to increasing dwell time, the subsequent train has to wait outside a station or slow down if the platform is occupied by the preceding train.This process is repeated over and over again and delays increase more and more.So we had to identify how often or how large delays occur and take delay reduction measures, because it is pointless to blindly carry out delay reduction measures.The measures should be carried out effectively; otherwise investigations and running costs become high.In this paper, we introduce delay reduction measures and indices, which indicate the frequency of delays and the scale of delays.

Why it matters

OpenAlex reports 7 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

In the Tokyo metropolitan area of Japan, several minutes of delays often happen during morning rush hour.This is because a massive number of passengers use trains for commuting.Then trains and platforms are congested.Above all, once a train delays due to increasing dwell time, the subsequent train has to wait outside a station or slow down if the platform is occupied by the preceding train.This process is repeated over and over again and delays increase more and more.So we had to identify how often or how large delays occur and take delay reduction measures, because it is pointless to blindly carry out delay reduction measures.The measures should be carried out effectively; otherwise investigations and running costs become high.In this paper, we introduce delay reduction measures and indices, which indicate the frequency of delays and the scale of delays.

Key concepts: Metropolitan area, Reduction (mathematics), Transport engineering, Computer science, Engineering, Geography, Mathematics, Geometry

Related papers

Back to paper searchBrowse research topicsOriginal source
Taking effective delay reduction measures and using delay elements as indices for Tokyo’s metropolitan railways — Research Paper | ScholarLens