Coupled Geomechanics and Reservoir Simulation

L. K. Thomas, Lee Chin, Ray G. Pierson, J. E. Sylte

Open publisher page 72 citations

Abstract

Summary An iterative procedure is presented in this paper to couple geomechanics and reservoir simulation models for the simulation of weaker rock formations with complex constitutive behavior. Parallel computing is employed in the coupled model to reduce run time in the compute intensive geomechanics model. The procedures developed here are general, and can be applied to any reservoir simulation and geomechanics model. Field and example problems under a variety of exploitation scenarios are presented to demonstrate the utility and robust nature of the coupled model. For example, a large-scale field case was simulated using the coupled model with 16 processors for the geomechanics model. The total CPU time for a 30-year simulation run was approximately 2 hours. These results indicate that it is both economical and practical to use the proposed procedure and parallel computing for analyzing field-scale problems that integrate reservoir and geomechanics simulation.

About this research paper

What this paper is about

Summary An iterative procedure is presented in this paper to couple geomechanics and reservoir simulation models for the simulation of weaker rock formations with complex constitutive behavior. Parallel computing is employed in the coupled model to reduce run time in the compute intensive geomechanics model. The procedures developed here are general, and can be applied to any reservoir simulation and geomechanics model. Field and example problems under a variety of exploitation scenarios are presented to demonstrate the utility and robust nature of the coupled model. For example, a large-scale field case was simulated using the coupled model with 16 processors for the geomechanics model. The total CPU time for a 30-year simulation run was approximately 2 hours. These results indicate that it is both economical and practical to use the proposed procedure and parallel computing for analyzing field-scale problems that integrate reservoir and geomechanics simulation.

Why it matters

OpenAlex reports 72 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Summary An iterative procedure is presented in this paper to couple geomechanics and reservoir simulation models for the simulation of weaker rock formations with complex constitutive behavior. Parallel computing is employed in the coupled model to reduce run time in the compute intensive geomechanics model. The procedures developed here are general, and can be applied to any reservoir simulation and geomechanics model. Field and example problems under a variety of exploitation scenarios are presented to demonstrate the utility and robust nature of the coupled model. For example, a large-scale field case was simulated using the coupled model with 16 processors for the geomechanics model. The total CPU time for a 30-year simulation run was approximately 2 hours. These results indicate that it is both economical and practical to use the proposed procedure and parallel computing for analyzing field-scale problems that integrate reservoir and geomechanics simulation.

Key concepts: Geomechanics, Reservoir simulation, Field (mathematics), Computer science, Scale (ratio), Geology, Petroleum engineering, Computational science