Drill pipe failure is a very serious problem for Teikoku Oil Company(TOC) to continue deep well drilling. Then TOC has continued to carry out research in order to avoid this trouble and started some innovative methods to cope with the drill pipe failure. This paper introduces the following methods. One is drill pipe coating with zinc plating on surface as corrosion victim. The other is drill pipe management by using drill pipe fatigue database. In this database, the amount of fatigue is calculated from cumulative degree of Von Mises Stress on drill pipe multiplied by its rotational time. Von Mises Stress is calculated from equation and rotational time is referred from past drilling record. It has not been concluded yet whether this database would show correct amount of drill pipe fatigue. However, TOC continuously needs to perform trial and error and achieve a proper drill pipe management method.

Open-access reader

About this research paper

What this paper is about

Drill pipe failure is a very serious problem for Teikoku Oil Company(TOC) to continue deep well drilling. Then TOC has continued to carry out research in order to avoid this trouble and started some innovative methods to cope with the drill pipe failure. This paper introduces the following methods. One is drill pipe coating with zinc plating on surface as corrosion victim. The other is drill pipe management by using drill pipe fatigue database. In this database, the amount of fatigue is calculated from cumulative degree of Von Mises Stress on drill pipe multiplied by its rotational time. Von Mises Stress is calculated from equation and rotational time is referred from past drilling record. It has not been concluded yet whether this database would show correct amount of drill pipe fatigue. However, TOC continuously needs to perform trial and error and achieve a proper drill pipe management method.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Drill pipe failure is a very serious problem for Teikoku Oil Company(TOC) to continue deep well drilling. Then TOC has continued to carry out research in order to avoid this trouble and started some innovative methods to cope with the drill pipe failure. This paper introduces the following methods. One is drill pipe coating with zinc plating on surface as corrosion victim. The other is drill pipe management by using drill pipe fatigue database. In this database, the amount of fatigue is calculated from cumulative degree of Von Mises Stress on drill pipe multiplied by its rotational time. Von Mises Stress is calculated from equation and rotational time is referred from past drilling record. It has not been concluded yet whether this database would show correct amount of drill pipe fatigue. However, TOC continuously needs to perform trial and error and achieve a proper drill pipe management method.

Key concepts: Drill pipe, Drill, Drilling, von Mises yield criterion, Corrosion fatigue, Corrosion, Engineering, Structural engineering