Spillway and Outlet Works, Shelbyville Dam, Kaskaskia River, Illinois. Hydraulic Model Investigation.

Don R. Bucci, John L. Grace

Open publisher page 0 citations

Abstract

Tests were conducted on a 1:40-scale model reproducing the spillway for Shelbyville Dam, a combination concrete and earth structure rising 108 ft above the bed of the Kaskaskia River. The spillway consists of an ogee crest controlled by three tainter gates 45.33 ft wide and 36.92 ft high; a 156-ft-wide, 206-ft-long chute sloped 1 on 4; and a conventional hydraulic jump type stilling basin. The design flood, 162,500 cfs, will be passed at pool elevation 638.2 by combined operation: 157,500 cfs over the spillway and 5000 cfs through two 11-ft-high by 5.5-ft-wide sluices through the spillway section beneath the piers. Flow conditions in the approach, discharge characteristics of the spillway, hydrostatic pressures on the ogee weir crest, performance of the conventional stilling basin, and the height of the training walls were investigated. The limits of two exit channel protection plans involving the use of various sizes and gradations of stone and concrete paving were developed with and without berms behind the training walls. (Author)

About this research paper

What this paper is about

Tests were conducted on a 1:40-scale model reproducing the spillway for Shelbyville Dam, a combination concrete and earth structure rising 108 ft above the bed of the Kaskaskia River. The spillway consists of an ogee crest controlled by three tainter gates 45.33 ft wide and 36.92 ft high; a 156-ft-wide, 206-ft-long chute sloped 1 on 4; and a conventional hydraulic jump type stilling basin. The design flood, 162,500 cfs, will be passed at pool elevation 638.2 by combined operation: 157,500 cfs over the spillway and 5000 cfs through two 11-ft-high by 5.5-ft-wide sluices through the spillway section beneath the piers. Flow conditions in the approach, discharge characteristics of the spillway, hydrostatic pressures on the ogee weir crest, performance of the conventional stilling basin, and the height of the training walls were investigated. The limits of two exit channel protection plans involving the use of various sizes and gradations of stone and concrete paving were developed with and without berms behind the training walls. (Author)

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Tests were conducted on a 1:40-scale model reproducing the spillway for Shelbyville Dam, a combination concrete and earth structure rising 108 ft above the bed of the Kaskaskia River. The spillway consists of an ogee crest controlled by three tainter gates 45.33 ft wide and 36.92 ft high; a 156-ft-wide, 206-ft-long chute sloped 1 on 4; and a conventional hydraulic jump type stilling basin. The design flood, 162,500 cfs, will be passed at pool elevation 638.2 by combined operation: 157,500 cfs over the spillway and 5000 cfs through two 11-ft-high by 5.5-ft-wide sluices through the spillway section beneath the piers. Flow conditions in the approach, discharge characteristics of the spillway, hydrostatic pressures on the ogee weir crest, performance of the conventional stilling basin, and the height of the training walls were investigated. The limits of two exit channel protection plans involving the use of various sizes and gradations of stone and concrete paving were developed with and without berms behind the training walls. (Author)

Key concepts: Spillway, Berm, Weir, Geotechnical engineering, Crest, Geology, Flood myth, Engineering