The Influence Factors Analysis of Initial Excess Pore Water Pressure Caused by Construction of Shield Tunnels
Xin Jiang Wei, Wei Jun Chen, Gang Wei, An Yuan Liu
Abstract
Xin Jiang Wei, Wei Jun Chen, Gang Wei, An Yuan Liu
Abstract
Excess pore water pressure caused by construction dissipated, resulting in consolidation settlement. The formula of initial excess pore water pressure around tunnel lining was deduced by stress relief theory, and its formula within the region of its distribution at any point was subsequently deduced by stress transfer theory. By comparing the measured data, shows that the calculated closed to the measured, and with the distance increased the initial excess pore water pressure decreased in a concave curve shape. When the depth of tunnel increased or the diameter decreased, would made initial excess pore water pressure between the tunnel bottom and tunnel center horizon around tunnel lining more different. At a certain depth, the mast initial excess pore water pressure above tunnel axis, away from the axis reduced; showing a similar PECK shape.
OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Excess pore water pressure caused by construction dissipated, resulting in consolidation settlement. The formula of initial excess pore water pressure around tunnel lining was deduced by stress relief theory, and its formula within the region of its distribution at any point was subsequently deduced by stress transfer theory. By comparing the measured data, shows that the calculated closed to the measured, and with the distance increased the initial excess pore water pressure decreased in a concave curve shape. When the depth of tunnel increased or the diameter decreased, would made initial excess pore water pressure between the tunnel bottom and tunnel center horizon around tunnel lining more different. At a certain depth, the mast initial excess pore water pressure above tunnel axis, away from the axis reduced; showing a similar PECK shape.
Key concepts: Pore water pressure, Consolidation (business), Shield, Geotechnical engineering, Materials science, Settlement (finance), Mechanics, Geology