Evolution of Contractor’s Construction Schedule to Meet Engineer’s Satisfaction
Mohamed-Asem Uthman Abdul-Malak, Zeina Ahmad Hassanein
Abstract
Mohamed-Asem Uthman Abdul-Malak, Zeina Ahmad Hassanein
Abstract
With the increasing complexity of construction projects, proper planning and control of project activities now represent key issues in the management function. Pre-tender planning leading to a cost estimate is normally used as a baseline for project control in the subsequent project stages. That is, construction planning and cost estimation are done in parallel to reach a realistic cost estimate. However, not enough scheduling can be done at the tender stage because scheduling requires a certain level of detail for the work items. It is proposed that the misconception that the contractor is able to submit a full-fledged detailed construction schedule on awarding of the contract, followed later by regular updates, be replaced with a rolling-wave concept that permits work items with different levels of detail to be shown simultaneously in any version of the schedule. A procedure for generating the first construction program and gradually developing it during the construction phase is proposed. This procedure is aimed at allowing engineers and contractors the opportunity to understand the intrinsic principles for proper administration of the construction schedule.
OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
With the increasing complexity of construction projects, proper planning and control of project activities now represent key issues in the management function. Pre-tender planning leading to a cost estimate is normally used as a baseline for project control in the subsequent project stages. That is, construction planning and cost estimation are done in parallel to reach a realistic cost estimate. However, not enough scheduling can be done at the tender stage because scheduling requires a certain level of detail for the work items. It is proposed that the misconception that the contractor is able to submit a full-fledged detailed construction schedule on awarding of the contract, followed later by regular updates, be replaced with a rolling-wave concept that permits work items with different levels of detail to be shown simultaneously in any version of the schedule. A procedure for generating the first construction program and gradually developing it during the construction phase is proposed. This procedure is aimed at allowing engineers and contractors the opportunity to understand the intrinsic principles for proper administration of the construction schedule.
Key concepts: Schedule, Pre-construction services, Project planning, Construction management, Scheduling (production processes), Project management, Control (management), Design–build