1985International Journal of Operations & Production ManagementRequires access

Dynamic Simulation of a Kanban Production Inventory System

Maling Ebrahimpour, Batoul Modarress Fathi

Open publisher page 51 citations

Abstract

The implementation of the Japanese inventory control system, Kanban, in a production line, reduces Work‐in‐Process (WIP) inventory without affecting production or sales, though there is a point at which the reverse becomes true. The hypothesis that Kanban policy would reduce total WIP inventory without affecting production/sales at all was tested under two environmental conditions, cyclical demand and constant growth demand, by means of a simulated model, and also showed that under cyclical demand, frequent starts and stops in the line due to use of all the Kanban cards will produce eventual growth in all inventories, if not rectified. It is hoped that further research will develop a sufficently comprehensive model to facilitate the implementation of such a materials handling system.

About this research paper

What this paper is about

The implementation of the Japanese inventory control system, Kanban, in a production line, reduces Work‐in‐Process (WIP) inventory without affecting production or sales, though there is a point at which the reverse becomes true. The hypothesis that Kanban policy would reduce total WIP inventory without affecting production/sales at all was tested under two environmental conditions, cyclical demand and constant growth demand, by means of a simulated model, and also showed that under cyclical demand, frequent starts and stops in the line due to use of all the Kanban cards will produce eventual growth in all inventories, if not rectified. It is hoped that further research will develop a sufficently comprehensive model to facilitate the implementation of such a materials handling system.

Why it matters

OpenAlex reports 51 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The implementation of the Japanese inventory control system, Kanban, in a production line, reduces Work‐in‐Process (WIP) inventory without affecting production or sales, though there is a point at which the reverse becomes true. The hypothesis that Kanban policy would reduce total WIP inventory without affecting production/sales at all was tested under two environmental conditions, cyclical demand and constant growth demand, by means of a simulated model, and also showed that under cyclical demand, frequent starts and stops in the line due to use of all the Kanban cards will produce eventual growth in all inventories, if not rectified. It is hoped that further research will develop a sufficently comprehensive model to facilitate the implementation of such a materials handling system.

Key concepts: Kanban, Production (economics), Inventory control, Computer science, Operations management, Process (computing), Operations research, Production line

Related papers

Back to paper searchBrowse research topicsOriginal source
Dynamic Simulation of a Kanban Production Inventory System — Research Paper | ScholarLens