Hydro-Quebec's Experience with the Design and Construction of 1500 KM of 735 KV Chainette Transmission Lines
Elias Ghannoum, Michel Lamarre
Abstract
Elias Ghannoum, Michel Lamarre
Abstract
This paper deals with the design and construction experience that Hydro-Quebec acquired with 1500 km of 735 kV chainette lines already in service. The design features of this type of tower are discussed as well as the parameters of the chainette tower used on James Bay lines. Through the paper, the construction of the chainette tower is compared to the guyed V tower and the productivities of construction crews are discussed. Comparative material and construction costs are also detailed in the paper.
OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
This paper deals with the design and construction experience that Hydro-Quebec acquired with 1500 km of 735 kV chainette lines already in service. The design features of this type of tower are discussed as well as the parameters of the chainette tower used on James Bay lines. Through the paper, the construction of the chainette tower is compared to the guyed V tower and the productivities of construction crews are discussed. Comparative material and construction costs are also detailed in the paper.
Key concepts: Tower, Electric power transmission, Engineering, Civil engineering, Service (business), Architectural engineering, Electrical engineering, Business