Resource Constrained Scheduling within Fixed Project Durations

Rongxuan Li, Robert J. Willis

Open publisher page 17 citations

Abstract

This paper presents a practical approach for resource constrained scheduling within a given project duration. The method ensures a stable project plan when activity durations are reduced to achieve this. It handles all four categories of resource (unconstrained, renewable, non-renewable and doubly-constrained resources), and aims to shorten the project duration at minimum cost. Soft constraints and resource availabilities which vary over time are allowed in the method. Computational experience is reported.

About this research paper

What this paper is about

This paper presents a practical approach for resource constrained scheduling within a given project duration. The method ensures a stable project plan when activity durations are reduced to achieve this. It handles all four categories of resource (unconstrained, renewable, non-renewable and doubly-constrained resources), and aims to shorten the project duration at minimum cost. Soft constraints and resource availabilities which vary over time are allowed in the method. Computational experience is reported.

Why it matters

OpenAlex reports 17 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This paper presents a practical approach for resource constrained scheduling within a given project duration. The method ensures a stable project plan when activity durations are reduced to achieve this. It handles all four categories of resource (unconstrained, renewable, non-renewable and doubly-constrained resources), and aims to shorten the project duration at minimum cost. Soft constraints and resource availabilities which vary over time are allowed in the method. Computational experience is reported.

Key concepts: Project management, Scheduling (production processes), Operations research, Computer science, Duration (music), Renewable resource, Resource (disambiguation), Schedule