Simultaneous Wireline Operations From a Floating Rig With a Subsea Lubricator
Christopher T. Hopper
Abstract
Christopher T. Hopper
Abstract
Summary In 1987, an extensive wireline program was completed on two subsea wells in the Highlander field in the central North Sea with a subsea lubricator deployed from a drilling rig that was drilling and working over adjacent wells. Working on two wells concurrently is a way to reduce the operating costs of a subsea development significantly.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Summary In 1987, an extensive wireline program was completed on two subsea wells in the Highlander field in the central North Sea with a subsea lubricator deployed from a drilling rig that was drilling and working over adjacent wells. Working on two wells concurrently is a way to reduce the operating costs of a subsea development significantly.
Key concepts: Subsea, Wireline, Petroleum engineering, Marine engineering, Geology, Drilling, North sea, Drilling rig