Burnup in Criticality Safety for Spent Fuel Casks
R.W. Carlson, L.E. Fischer
Abstract
R.W. Carlson, L.E. Fischer
Abstract
Criticality safety margins must be based upon the combination of the best available prediction of the margin and all uncertainties in the prediction. Inclusion of the effects of burnup in the evaluation of spent fuel shipping or storage casks must be based upon a thorough understanding of the prediction of the effects of burnup and the uncertainties in the measurements (or predictions) of burnup and predictions of the effects. A preliminary estimate of the effects of burnup and its uncertainties is presented. This will serve as a first step in the effort to develop acceptance criteria that assure public safety. An assembly average burnup of 20,000 MWD/MTU represents an increase in the criticality safety margin of about 20% (δk/k), and the current estimate of the uncertainty in this value is close to 4% (δk/k). The uncertainties in the components of the effects of burnup were based upon relevant literature citations and — where no other information was available — upon estimates. Consequently, the margins and uncertainties in the margin presented here should be considered as initial estimates upon which more refined analyses should build to develop a defensible basis for predicting and reviewing the criticality safety margins which include the effects of burnup.
OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Criticality safety margins must be based upon the combination of the best available prediction of the margin and all uncertainties in the prediction. Inclusion of the effects of burnup in the evaluation of spent fuel shipping or storage casks must be based upon a thorough understanding of the prediction of the effects of burnup and the uncertainties in the measurements (or predictions) of burnup and predictions of the effects. A preliminary estimate of the effects of burnup and its uncertainties is presented. This will serve as a first step in the effort to develop acceptance criteria that assure public safety. An assembly average burnup of 20,000 MWD/MTU represents an increase in the criticality safety margin of about 20% (δk/k), and the current estimate of the uncertainty in this value is close to 4% (δk/k). The uncertainties in the components of the effects of burnup were based upon relevant literature citations and — where no other information was available — upon estimates. Consequently, the margins and uncertainties in the margin presented here should be considered as initial estimates upon which more refined analyses should build to develop a defensible basis for predicting and reviewing the criticality safety margins which include the effects of burnup.
Key concepts: Burnup, Criticality, Margin (machine learning), Nuclear engineering, Environmental science, Spent nuclear fuel, Engineering, Computer science