1974•IEEE Transactions on Power Apparatus and SystemsRequires access

The Use of Single-Phase Overhead Test Lines and Test Cages to Evaluate the Corona Effects of EHV and UHV Transmission Lines

Michael Comber, Luciano E. Zaffanella

Open publisher page 25 citations

Abstract

Economic considerations often limit the use of full-scale 3-phase test lines for the investigation of transmission-line corona effects. Testing of a large number of different conductor configurations can be more conveniently and efficiently carried out on comparatively short sections of conductors on single-phase test lines and in test cages. Techniques for measuring the single-phase corona performance of conductors are presented, along with a discussion of means by which the observed data can be used to determine the corona performance of 3-phase transmission lines.

About this research paper

What this paper is about

Economic considerations often limit the use of full-scale 3-phase test lines for the investigation of transmission-line corona effects. Testing of a large number of different conductor configurations can be more conveniently and efficiently carried out on comparatively short sections of conductors on single-phase test lines and in test cages. Techniques for measuring the single-phase corona performance of conductors are presented, along with a discussion of means by which the observed data can be used to determine the corona performance of 3-phase transmission lines.

Why it matters

OpenAlex reports 25 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Economic considerations often limit the use of full-scale 3-phase test lines for the investigation of transmission-line corona effects. Testing of a large number of different conductor configurations can be more conveniently and efficiently carried out on comparatively short sections of conductors on single-phase test lines and in test cages. Techniques for measuring the single-phase corona performance of conductors are presented, along with a discussion of means by which the observed data can be used to determine the corona performance of 3-phase transmission lines.

Key concepts: Electric power transmission, Electrical conductor, Conductor, Overhead line, Overhead (engineering), Transmission line, Corona (planetary geology), Electrical engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
The Use of Single-Phase Overhead Test Lines and Test Cages to Evaluate the Corona Effects of EHV and UHV Transmission Lines — Research Paper | ScholarLens