ITEP complex for proton and heavy ion acceleration

N.N. Alexeev, M. A. Veselov, L.L. Gol'din, Ju. M. Zlatov, Ju. B. Zudinov, B. I. Kruglov, P.I. Lebedev, V. I. Nicolaev, K. K. Onosovsky, I.V. Chuvilo, V. Shevchenko, A. Vasiljev

Open publisher page 3 citations

Abstract

The realization of the first stage of reconstruction is not connected with any serious civil engineering work or special equipment construction. The need of very high vacuum (10-10tor) and therefore the total reconstruction of the vacuwu system is the most difficult feattn•e of the project. As it was mentioned above development works in this field are successfully advancing. The two-gap accelerator-injector is in the process of installation. IIi.c;h-frequency system is intensively worked at. Development of heavy ion sources is started. The first part of the project can be accomplished within next few year. The works on the second and the third project parts are yet in an initial stage.

About this research paper

What this paper is about

The realization of the first stage of reconstruction is not connected with any serious civil engineering work or special equipment construction. The need of very high vacuum (10-10tor) and therefore the total reconstruction of the vacuwu system is the most difficult feattn•e of the project. As it was mentioned above development works in this field are successfully advancing. The two-gap accelerator-injector is in the process of installation. IIi.c;h-frequency system is intensively worked at. Development of heavy ion sources is started. The first part of the project can be accomplished within next few year. The works on the second and the third project parts are yet in an initial stage.

Why it matters

OpenAlex reports 3 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The realization of the first stage of reconstruction is not connected with any serious civil engineering work or special equipment construction. The need of very high vacuum (10-10tor) and therefore the total reconstruction of the vacuwu system is the most difficult feattn•e of the project. As it was mentioned above development works in this field are successfully advancing. The two-gap accelerator-injector is in the process of installation. IIi.c;h-frequency system is intensively worked at. Development of heavy ion sources is started. The first part of the project can be accomplished within next few year. The works on the second and the third project parts are yet in an initial stage.

Key concepts: Realization (probability), Heavy ion, Injector, Acceleration, Process (computing), Work (physics), Physics, Stage (stratigraphy)

Related papers

Back to paper searchBrowse research topicsOriginal source
ITEP complex for proton and heavy ion acceleration — Research Paper | ScholarLens