MELCOR simulation of long-term station blackout at Peach Bottom
Imtiaz Kamil Madni
Abstract
Open-access reader
Imtiaz Kamil Madni
Abstract
Open-access reader
This paper presents the results from MELCOR (Version 1.8BC) calculations of the Long-Term Station Blackout Accident Sequence, with failure to depressurize the reactor vessel, at the Peach Bottom (BWR Mark I) plant, and presents comparisons with Source Term Code Package (STCP) calculations of the same sequence. This sequence assumes that batteries are available for six hours following loss of all power to the plant. Following battery failure, the reactor coolant system (RCS) inventory is boiled off through the relief valves by continued decay heat generation. This leads to core uncovery, heatup, clad oxidation, core degradation, relocation, and, eventually, vessel failure at high pressure. STCP has calculated the transient out to 13.5 hours after core uncovery. The results include the timing of key events, pressure and temperature response in the reactor vessel and containment, hydrogen production, and the release of source terms to the environment. 12 refs., 23 figs., 3 tabs.
OpenAlex reports 5 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
This paper presents the results from MELCOR (Version 1.8BC) calculations of the Long-Term Station Blackout Accident Sequence, with failure to depressurize the reactor vessel, at the Peach Bottom (BWR Mark I) plant, and presents comparisons with Source Term Code Package (STCP) calculations of the same sequence. This sequence assumes that batteries are available for six hours following loss of all power to the plant. Following battery failure, the reactor coolant system (RCS) inventory is boiled off through the relief valves by continued decay heat generation. This leads to core uncovery, heatup, clad oxidation, core degradation, relocation, and, eventually, vessel failure at high pressure. STCP has calculated the transient out to 13.5 hours after core uncovery. The results include the timing of key events, pressure and temperature response in the reactor vessel and containment, hydrogen production, and the release of source terms to the environment. 12 refs., 23 figs., 3 tabs.
Key concepts: Blackout, Term (time), Environmental science, Computer science, Electric power system, Power (physics), Physics, Quantum mechanics