2011Advanced materials researchRequires access

Constructed Wetland Series Process for Pretreatment Raw Water of Drinking Water Treatment Plant

Yang Xu, Wen Shi, Wen Zhe Li, Lu Wan, Xiao Yan, Ji Fu Wang, Shui Li Yu

Open publisher page 4 citations

Abstract

In order to investigate the feasibility of pre-treatment of drinking water treatment plant by the constructed wetland and provide the operation parameters for a full scale constructed wetland to improve the quality of raw water. The constructed wetland series process was used to pre-treat influent water of drinking water treatment plant based on raw water of the Song hua jiang River. The results showed that when the influent flux was 1m3/d, the average removal rates of Turbidity, COD, TN and NH4+-N in the constructed wetland system were 94.27%, 56.77%, 2.37% and 55.65% , respectively. The wetland system has high treatment effect and run stably in the pretreatment process of the raw water. This system could lighten the load of the conventional water treatment processes effectively.

About this research paper

What this paper is about

In order to investigate the feasibility of pre-treatment of drinking water treatment plant by the constructed wetland and provide the operation parameters for a full scale constructed wetland to improve the quality of raw water. The constructed wetland series process was used to pre-treat influent water of drinking water treatment plant based on raw water of the Song hua jiang River. The results showed that when the influent flux was 1m3/d, the average removal rates of Turbidity, COD, TN and NH4+-N in the constructed wetland system were 94.27%, 56.77%, 2.37% and 55.65% , respectively. The wetland system has high treatment effect and run stably in the pretreatment process of the raw water. This system could lighten the load of the conventional water treatment processes effectively.

Why it matters

OpenAlex reports 4 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

In order to investigate the feasibility of pre-treatment of drinking water treatment plant by the constructed wetland and provide the operation parameters for a full scale constructed wetland to improve the quality of raw water. The constructed wetland series process was used to pre-treat influent water of drinking water treatment plant based on raw water of the Song hua jiang River. The results showed that when the influent flux was 1m3/d, the average removal rates of Turbidity, COD, TN and NH4+-N in the constructed wetland system were 94.27%, 56.77%, 2.37% and 55.65% , respectively. The wetland system has high treatment effect and run stably in the pretreatment process of the raw water. This system could lighten the load of the conventional water treatment processes effectively.

Key concepts: Raw water, Turbidity, Wetland, Environmental science, Constructed wetland, Environmental engineering, Water quality, Water treatment

Related papers

Back to paper searchBrowse research topicsOriginal source
Constructed Wetland Series Process for Pretreatment Raw Water of Drinking Water Treatment Plant — Research Paper | ScholarLens