ELECTRIFICATION OF THE MIDLAND SUBURBAN LINE FROM LONDON TO BEDFORD: C IVIL ENGINEERING ASPECTS.
TD STEVENSON
Abstract
TD STEVENSON
Abstract
Keywords BRITISH RAIL, LONDON MIDLAND REGION RAILWAYS, ELECTRIFICATION, SUBURBAN, PLANNING, CONSTRUCTION, TRAINS, PROJECTS, DESIGN, FEASIBILITY, MANAGEMENT, DEMAND, PASSENGERS, COMMUTING, ROLLING STOCK, PERMANENT WAY, BRIDGES, STRUCTURES, TUNNELS, WIDENING, MAINTENANCE, SERVICING, COSTS LONDON, BEDFORD UK... Show All
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Keywords BRITISH RAIL, LONDON MIDLAND REGION RAILWAYS, ELECTRIFICATION, SUBURBAN, PLANNING, CONSTRUCTION, TRAINS, PROJECTS, DESIGN, FEASIBILITY, MANAGEMENT, DEMAND, PASSENGERS, COMMUTING, ROLLING STOCK, PERMANENT WAY, BRIDGES, STRUCTURES, TUNNELS, WIDENING, MAINTENANCE, SERVICING, COSTS LONDON, BEDFORD UK... Show All
Key concepts: Electrification, Train, Stock (firearms), Railway line, Engineering, Civil engineering, Transport engineering, Geography