Chilled water storage cooling system for an Army installation

Chang W. Sohn, J. Fuchs, M. Gruber

Open publisher page 10 citations

Abstract

A 2.25 million gal (8,517 m{sup 3}) chilled water storage cooling system for the Central Energy Plant (CEP) No. 2 at an Army installation has been in operation since May 1996. The installation has 10.4 million sq ft (0.97 million m{sup 2}) of building space and services housing and offices for 28,000 population. A district cooling system with the CEP No. 2 covers more than half of the installation. During the first year of operation in 1996, the system shifted more than 3 MW of electrical demand from the on-peak to off-peak period. Electrical cost savings for the installation is calculated to be about $430,000 during the first year of operation. The system will pay back in less than 3 years for the net construction cost of $1,200,000. A second system is currently under design for another central energy plant (CEP No. 1) at the installation.

About this research paper

What this paper is about

A 2.25 million gal (8,517 m{sup 3}) chilled water storage cooling system for the Central Energy Plant (CEP) No. 2 at an Army installation has been in operation since May 1996. The installation has 10.4 million sq ft (0.97 million m{sup 2}) of building space and services housing and offices for 28,000 population. A district cooling system with the CEP No. 2 covers more than half of the installation. During the first year of operation in 1996, the system shifted more than 3 MW of electrical demand from the on-peak to off-peak period. Electrical cost savings for the installation is calculated to be about $430,000 during the first year of operation. The system will pay back in less than 3 years for the net construction cost of $1,200,000. A second system is currently under design for another central energy plant (CEP No. 1) at the installation.

Why it matters

OpenAlex reports 10 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

A 2.25 million gal (8,517 m{sup 3}) chilled water storage cooling system for the Central Energy Plant (CEP) No. 2 at an Army installation has been in operation since May 1996. The installation has 10.4 million sq ft (0.97 million m{sup 2}) of building space and services housing and offices for 28,000 population. A district cooling system with the CEP No. 2 covers more than half of the installation. During the first year of operation in 1996, the system shifted more than 3 MW of electrical demand from the on-peak to off-peak period. Electrical cost savings for the installation is calculated to be about $430,000 during the first year of operation. The system will pay back in less than 3 years for the net construction cost of $1,200,000. A second system is currently under design for another central energy plant (CEP No. 1) at the installation.

Key concepts: Chilled water, Water cooling, Engineering, Environmental science, Population, Waste management, Mechanical engineering, Demography

Related papers

Back to paper searchBrowse research topicsOriginal source
Chilled water storage cooling system for an Army installation — Research Paper | ScholarLens