Chilled water storage cooling system for an Army installation
Chang W. Sohn, J. Fuchs, M. Gruber
Abstract
Chang W. Sohn, J. Fuchs, M. Gruber
Abstract
A 2.25 million gal (8,517 m{sup 3}) chilled water storage cooling system for the Central Energy Plant (CEP) No. 2 at an Army installation has been in operation since May 1996. The installation has 10.4 million sq ft (0.97 million m{sup 2}) of building space and services housing and offices for 28,000 population. A district cooling system with the CEP No. 2 covers more than half of the installation. During the first year of operation in 1996, the system shifted more than 3 MW of electrical demand from the on-peak to off-peak period. Electrical cost savings for the installation is calculated to be about $430,000 during the first year of operation. The system will pay back in less than 3 years for the net construction cost of $1,200,000. A second system is currently under design for another central energy plant (CEP No. 1) at the installation.
OpenAlex reports 10 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
A 2.25 million gal (8,517 m{sup 3}) chilled water storage cooling system for the Central Energy Plant (CEP) No. 2 at an Army installation has been in operation since May 1996. The installation has 10.4 million sq ft (0.97 million m{sup 2}) of building space and services housing and offices for 28,000 population. A district cooling system with the CEP No. 2 covers more than half of the installation. During the first year of operation in 1996, the system shifted more than 3 MW of electrical demand from the on-peak to off-peak period. Electrical cost savings for the installation is calculated to be about $430,000 during the first year of operation. The system will pay back in less than 3 years for the net construction cost of $1,200,000. A second system is currently under design for another central energy plant (CEP No. 1) at the installation.