2008Geografiska Annaler Series A Physical GeographyRequires access

A suspended sediment budget of the yichang‐wuhan reach of the yangtze river, china

Jiongxin Xu

Open publisher page 1 citations

Abstract

.The amount of the sediment deposition in the Yichan‐Wuhan reach of the middle Yangtze River (also known as Changjiang River) has been determined using the concept of sediment budget at the channel‐reach scale. The fill‐scour processes of the middle Yangtze River were studied during the period 1956–1997 in response to the variation in sediment load and flow inputs. The results show that 13.3% of the net input of sediment was deposited in the studied river reach. Since 1956, the output sediment load of the studied reach increased with time to 1981, followed by a decline. The increase in output before 1981 can be related to the man‐made bend neck‐cutoff which caused a decrease in the sediment load diverted through the ‘three outfalls’ (i.e. the three distributaries from the Yangtze main stem to the Dongting Lake) and increased the sediment‐carrying capacity of the river. Thereby, the river could transport more sediment to the outlet of the studied river reach. The decrease in the sediment load output after 1984 was directly due to the decreased sediment load at Yichang station. Multiple regression equations have been established to assess the contributions of influencing factors to the variation in sediment deposition amount in the studied river reach.

About this research paper

What this paper is about

.The amount of the sediment deposition in the Yichan‐Wuhan reach of the middle Yangtze River (also known as Changjiang River) has been determined using the concept of sediment budget at the channel‐reach scale. The fill‐scour processes of the middle Yangtze River were studied during the period 1956–1997 in response to the variation in sediment load and flow inputs. The results show that 13.3% of the net input of sediment was deposited in the studied river reach. Since 1956, the output sediment load of the studied reach increased with time to 1981, followed by a decline. The increase in output before 1981 can be related to the man‐made bend neck‐cutoff which caused a decrease in the sediment load diverted through the ‘three outfalls’ (i.e. the three distributaries from the Yangtze main stem to the Dongting Lake) and increased the sediment‐carrying capacity of the river. Thereby, the river could transport more sediment to the outlet of the studied river reach. The decrease in the sediment load output after 1984 was directly due to the decreased sediment load at Yichang station. Multiple regression equations have been established to assess the contributions of influencing factors to the variation in sediment deposition amount in the studied river reach.

Why it matters

OpenAlex reports 1 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

.The amount of the sediment deposition in the Yichan‐Wuhan reach of the middle Yangtze River (also known as Changjiang River) has been determined using the concept of sediment budget at the channel‐reach scale. The fill‐scour processes of the middle Yangtze River were studied during the period 1956–1997 in response to the variation in sediment load and flow inputs. The results show that 13.3% of the net input of sediment was deposited in the studied river reach. Since 1956, the output sediment load of the studied reach increased with time to 1981, followed by a decline. The increase in output before 1981 can be related to the man‐made bend neck‐cutoff which caused a decrease in the sediment load diverted through the ‘three outfalls’ (i.e. the three distributaries from the Yangtze main stem to the Dongting Lake) and increased the sediment‐carrying capacity of the river. Thereby, the river could transport more sediment to the outlet of the studied river reach. The decrease in the sediment load output after 1984 was directly due to the decreased sediment load at Yichang station. Multiple regression equations have been established to assess the contributions of influencing factors to the variation in sediment deposition amount in the studied river reach.

Key concepts: Sedimentary budget, Sediment, Hydrology (agriculture), Yangtze river, Deposition (geology), Environmental science, Channel (broadcasting), Sediment transport

Related papers

Back to paper searchBrowse research topicsOriginal source
A suspended sediment budget of the yichang‐wuhan reach of the yangtze river, china — Research Paper | ScholarLens