2003•Engineering OptimizationRequires access

Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging

Yuan-Shyi Peter Chiu

Open publisher page 221 citations

Abstract

This paper considers the effects of the reworking of defective items on the economic production quantity (EPQ) model with backlogging allowed. The classic EPQ model assumes that manufacturing facility functions perfectly during a production run. However, due to process deterioration or other factors, the production process may shift and produce imperfect quality items. In this study, a random defective rate is considered, and when regular production ends, the reworking of defective items starts immediately. Not all of the defective items are reworked, a portion of them are scrap and are discarded. Repairing and holding cost per reworked item and disposal cost per scrap item are included in the proposed mathematical modelling and analysis. The renewal reward theorem is utilized to deal with the variable cycle length, and the optimal lot size that minimizes the overall costs for the imperfect quality EPQ model is derived where backorders are permitted.

About this research paper

What this paper is about

This paper considers the effects of the reworking of defective items on the economic production quantity (EPQ) model with backlogging allowed. The classic EPQ model assumes that manufacturing facility functions perfectly during a production run. However, due to process deterioration or other factors, the production process may shift and produce imperfect quality items. In this study, a random defective rate is considered, and when regular production ends, the reworking of defective items starts immediately. Not all of the defective items are reworked, a portion of them are scrap and are discarded. Repairing and holding cost per reworked item and disposal cost per scrap item are included in the proposed mathematical modelling and analysis. The renewal reward theorem is utilized to deal with the variable cycle length, and the optimal lot size that minimizes the overall costs for the imperfect quality EPQ model is derived where backorders are permitted.

Why it matters

OpenAlex reports 221 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This paper considers the effects of the reworking of defective items on the economic production quantity (EPQ) model with backlogging allowed. The classic EPQ model assumes that manufacturing facility functions perfectly during a production run. However, due to process deterioration or other factors, the production process may shift and produce imperfect quality items. In this study, a random defective rate is considered, and when regular production ends, the reworking of defective items starts immediately. Not all of the defective items are reworked, a portion of them are scrap and are discarded. Repairing and holding cost per reworked item and disposal cost per scrap item are included in the proposed mathematical modelling and analysis. The renewal reward theorem is utilized to deal with the variable cycle length, and the optimal lot size that minimizes the overall costs for the imperfect quality EPQ model is derived where backorders are permitted.

Key concepts: Rework, Economic production quantity, Scrap, Imperfect, Production (economics), Quality (philosophy), Process (computing), Mathematical optimization

Related papers

Back to paper searchBrowse research topicsOriginal source
Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backlogging — Research Paper | ScholarLens