2001Earth Surface Processes and LandformsRequires access

Determination of the sediment transport in an armoured gravel‐bed river

H. D. Duizendstra

Open publisher page 12 citations

Abstract

Abstract Information about sediment transport in the Common Meuse, an armoured gravel‐bed river, can be obtained by the determination of the relationship between sediment transport and discharge and integrating the relationship with respect to time, or by computing the differences between series of measured bed‐levels along the Common Meuse and integrating these differences. For three periods of 9, 8 and 17 years sediment transport computations are made with two series of relationships between sediment transport (Qb) and discharge (Q) in which the condition of the armour layer is taken into account. These sediment‐transport–discharge (Qb/Q) relationships are determined by local bed‐load transport measurements in the Common Meuse. At the beginning and the end of the first period (1978–1987) and at the end of the second period (1987–1995) bed levels have been measured by soundings. By the analysis of the measured bed levels at the beginning and the end of the two periods the sediment transport along the Common Meuse is estimated. The same analysis was carried out for the combined period (1978–1995). The yearly mean sediment transport computed by these two methods are compared. The necessity of carrying out bed‐load transport measurements at several locations in a cross‐section and over the entire range of discharges is clearly shown. Attention is paid to the advantages and disadvantages of the two methods and the need for applying more than one method to compute sediment transport. Copyright © 2001 John Wiley & Sons, Ltd.

About this research paper

What this paper is about

Abstract Information about sediment transport in the Common Meuse, an armoured gravel‐bed river, can be obtained by the determination of the relationship between sediment transport and discharge and integrating the relationship with respect to time, or by computing the differences between series of measured bed‐levels along the Common Meuse and integrating these differences. For three periods of 9, 8 and 17 years sediment transport computations are made with two series of relationships between sediment transport (Qb) and discharge (Q) in which the condition of the armour layer is taken into account. These sediment‐transport–discharge (Qb/Q) relationships are determined by local bed‐load transport measurements in the Common Meuse. At the beginning and the end of the first period (1978–1987) and at the end of the second period (1987–1995) bed levels have been measured by soundings. By the analysis of the measured bed levels at the beginning and the end of the two periods the sediment transport along the Common Meuse is estimated. The same analysis was carried out for the combined period (1978–1995). The yearly mean sediment transport computed by these two methods are compared. The necessity of carrying out bed‐load transport measurements at several locations in a cross‐section and over the entire range of discharges is clearly shown. Attention is paid to the advantages and disadvantages of the two methods and the need for applying more than one method to compute sediment transport. Copyright © 2001 John Wiley & Sons, Ltd.

Why it matters

OpenAlex reports 12 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Abstract Information about sediment transport in the Common Meuse, an armoured gravel‐bed river, can be obtained by the determination of the relationship between sediment transport and discharge and integrating the relationship with respect to time, or by computing the differences between series of measured bed‐levels along the Common Meuse and integrating these differences. For three periods of 9, 8 and 17 years sediment transport computations are made with two series of relationships between sediment transport (Qb) and discharge (Q) in which the condition of the armour layer is taken into account. These sediment‐transport–discharge (Qb/Q) relationships are determined by local bed‐load transport measurements in the Common Meuse. At the beginning and the end of the first period (1978–1987) and at the end of the second period (1987–1995) bed levels have been measured by soundings. By the analysis of the measured bed levels at the beginning and the end of the two periods the sediment transport along the Common Meuse is estimated. The same analysis was carried out for the combined period (1978–1995). The yearly mean sediment transport computed by these two methods are compared. The necessity of carrying out bed‐load transport measurements at several locations in a cross‐section and over the entire range of discharges is clearly shown. Attention is paid to the advantages and disadvantages of the two methods and the need for applying more than one method to compute sediment transport. Copyright © 2001 John Wiley & Sons, Ltd.

Key concepts: Sediment transport, Bed load, Sediment, Hydrology (agriculture), Water discharge, Geology, Environmental science, Range (aeronautics)

Related papers

Back to paper searchBrowse research topicsOriginal source
Determination of the sediment transport in an armoured gravel‐bed river — Research Paper | ScholarLens