1999International Journal of Energy ResearchRequires access

Performance enhancement in coal fired thermal power plants. Part II: steam turbines

M. Siddhartha Bhatt, N. Rajkumar

Open publisher page 21 citations

Abstract

This paper presents the results of the performance enhancement study on 22 coal fired thermal power stations of capacities 30–500 MW. The oldest units (30 MW) have served for 33yr and the newer units (500 MW) have been in operation since 7yr. The turbine efficiencies are in the range 31·00–41·90% as compared to the design range of 34·80–43·97%. The isentropic efficiencies are in the range 74·13–86·40% as compared to design values of 83·20–89·10%. Considerable scope for efficiency improvement through low cost solutions: operational optimization, capital overhaul, simple modifications, etc., exists for all classes of units. The efficiencies can be restored to their design values. The developments in turbines over the last quarter of this century which have led to improved isentropic and thermal efficiencies must be adopted for existing units through retrofits, upgrades and revamps. The turbine efficiencies can be improved to 38·0% for 30 MW units and to 47% for 500 MW units. The maximum potential is for improvement in 210 and 500 MW units followed by 110 and 120 MW units. The potential for 30 and 62·5 MW units is rather limited because of their low capacity share, lack of interest in manufacturers to sell spares (because of the low volume of requirement) and large pay back periods for modernisation schemes. Copyright © 1999 John Wiley & Sons, Ltd.

About this research paper

What this paper is about

This paper presents the results of the performance enhancement study on 22 coal fired thermal power stations of capacities 30–500 MW. The oldest units (30 MW) have served for 33yr and the newer units (500 MW) have been in operation since 7yr. The turbine efficiencies are in the range 31·00–41·90% as compared to the design range of 34·80–43·97%. The isentropic efficiencies are in the range 74·13–86·40% as compared to design values of 83·20–89·10%. Considerable scope for efficiency improvement through low cost solutions: operational optimization, capital overhaul, simple modifications, etc., exists for all classes of units. The efficiencies can be restored to their design values. The developments in turbines over the last quarter of this century which have led to improved isentropic and thermal efficiencies must be adopted for existing units through retrofits, upgrades and revamps. The turbine efficiencies can be improved to 38·0% for 30 MW units and to 47% for 500 MW units. The maximum potential is for improvement in 210 and 500 MW units followed by 110 and 120 MW units. The potential for 30 and 62·5 MW units is rather limited because of their low capacity share, lack of interest in manufacturers to sell spares (because of the low volume of requirement) and large pay back periods for modernisation schemes. Copyright © 1999 John Wiley & Sons, Ltd.

Why it matters

OpenAlex reports 21 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

This paper presents the results of the performance enhancement study on 22 coal fired thermal power stations of capacities 30–500 MW. The oldest units (30 MW) have served for 33yr and the newer units (500 MW) have been in operation since 7yr. The turbine efficiencies are in the range 31·00–41·90% as compared to the design range of 34·80–43·97%. The isentropic efficiencies are in the range 74·13–86·40% as compared to design values of 83·20–89·10%. Considerable scope for efficiency improvement through low cost solutions: operational optimization, capital overhaul, simple modifications, etc., exists for all classes of units. The efficiencies can be restored to their design values. The developments in turbines over the last quarter of this century which have led to improved isentropic and thermal efficiencies must be adopted for existing units through retrofits, upgrades and revamps. The turbine efficiencies can be improved to 38·0% for 30 MW units and to 47% for 500 MW units. The maximum potential is for improvement in 210 and 500 MW units followed by 110 and 120 MW units. The potential for 30 and 62·5 MW units is rather limited because of their low capacity share, lack of interest in manufacturers to sell spares (because of the low volume of requirement) and large pay back periods for modernisation schemes. Copyright © 1999 John Wiley & Sons, Ltd.

Key concepts: Capital cost, Steam turbine, Coal, Range (aeronautics), Turbine, Engineering, Payback period, Environmental science

Related papers

Back to paper searchBrowse research topicsOriginal source
Performance enhancement in coal fired thermal power plants. Part II: steam turbines — Research Paper | ScholarLens