2011Applied Mechanics and MaterialsOpen access

Design and Practice of Steam Flooding on Anisotropic Heavy-Oil Reservoir with Edge-Bottom Water

Jin Li Zhu, Liang Liang Jiang, Li Cheng Liu, Yu Qiu Lin

Open full text 2 citations

Abstract

Liaohe block J is a super heavy oil reservoir with relatively strong anisotropy and active edge-bottom water condition. After more than two decades of huff and puff production, the block now reaches a low production rate period, and the local part of the block also encounters serious edge-bottom water invasion. Now steam flooding is used as a switching method to invert the production decline tendency. Applied with thermal recovery process and numerical simulation method, reservoir pressure at flooding conversion, pressure control in steam flooding, injection-production parameters and well pattern are used to optimize the key techniques of steam flooding design. The design results are as follows: the reservoir pressure at flooding conversion as well as during steam flooding process should be controlled below 5 Mpa; the unit volume steam injection rate is 1.65t/d.hm2.m and the bottom-hole steam quality of injecter is no less than 53%; the injection-production ratio is 1.1:1 and inversed 9 point pattern with a 83m well space is used. The steam flooding pilot has been carried out for more than 2 years and obtains favorable benefits.

About this research paper

What this paper is about

Liaohe block J is a super heavy oil reservoir with relatively strong anisotropy and active edge-bottom water condition. After more than two decades of huff and puff production, the block now reaches a low production rate period, and the local part of the block also encounters serious edge-bottom water invasion. Now steam flooding is used as a switching method to invert the production decline tendency. Applied with thermal recovery process and numerical simulation method, reservoir pressure at flooding conversion, pressure control in steam flooding, injection-production parameters and well pattern are used to optimize the key techniques of steam flooding design. The design results are as follows: the reservoir pressure at flooding conversion as well as during steam flooding process should be controlled below 5 Mpa; the unit volume steam injection rate is 1.65t/d.hm2.m and the bottom-hole steam quality of injecter is no less than 53%; the injection-production ratio is 1.1:1 and inversed 9 point pattern with a 83m well space is used. The steam flooding pilot has been carried out for more than 2 years and obtains favorable benefits.

Why it matters

OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Liaohe block J is a super heavy oil reservoir with relatively strong anisotropy and active edge-bottom water condition. After more than two decades of huff and puff production, the block now reaches a low production rate period, and the local part of the block also encounters serious edge-bottom water invasion. Now steam flooding is used as a switching method to invert the production decline tendency. Applied with thermal recovery process and numerical simulation method, reservoir pressure at flooding conversion, pressure control in steam flooding, injection-production parameters and well pattern are used to optimize the key techniques of steam flooding design. The design results are as follows: the reservoir pressure at flooding conversion as well as during steam flooding process should be controlled below 5 Mpa; the unit volume steam injection rate is 1.65t/d.hm2.m and the bottom-hole steam quality of injecter is no less than 53%; the injection-production ratio is 1.1:1 and inversed 9 point pattern with a 83m well space is used. The steam flooding pilot has been carried out for more than 2 years and obtains favorable benefits.

Key concepts: Steam injection, Petroleum engineering, Flooding (psychology), Water flooding, Bottom water, Environmental science, Vapor quality, Geology

Related papers

Back to paper searchBrowse research topicsOriginal source
Design and Practice of Steam Flooding on Anisotropic Heavy-Oil Reservoir with Edge-Bottom Water — Research Paper | ScholarLens