Dual Resource Constrained Job Shop Dynamic Scheduling with Local Time Window
Yu‐An Huang, Xiu-Tian Yan, Jing Yao Li
Abstract
Yu‐An Huang, Xiu-Tian Yan, Jing Yao Li
Abstract
To solve the Dual Resource Constrained Job Shop Dynamic Scheduling Problem with heterogeneous workers (DRCJDSP-HW),a three-tier dynamic scheduling system including dynamic disturbance analysis, dynamic disturbance evaluation and dynamic scheduling method was constructed based on the idea of scheduling with local time window. To minimize the revision of old scheduling scheme in DRCJDSP-HW, a hybrid dynamic scheduling algorithm was proposed based on the chromosome reduction mechanism and the scheduling optimization of local job in stages. The outstanding application effect of the dynamic scheduling system and the hybrid dynamic scheduling algorithm were validated reducing the influence of dynamic disturbances effectively by simulation experiment at last.
OpenAlex reports 7 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
To solve the Dual Resource Constrained Job Shop Dynamic Scheduling Problem with heterogeneous workers (DRCJDSP-HW),a three-tier dynamic scheduling system including dynamic disturbance analysis, dynamic disturbance evaluation and dynamic scheduling method was constructed based on the idea of scheduling with local time window. To minimize the revision of old scheduling scheme in DRCJDSP-HW, a hybrid dynamic scheduling algorithm was proposed based on the chromosome reduction mechanism and the scheduling optimization of local job in stages. The outstanding application effect of the dynamic scheduling system and the hybrid dynamic scheduling algorithm were validated reducing the influence of dynamic disturbances effectively by simulation experiment at last.
Key concepts: Dynamic priority scheduling, Rate-monotonic scheduling, Two-level scheduling, Fair-share scheduling, Flow shop scheduling, Earliest deadline first scheduling, Computer science, Round-robin scheduling