Research on the Height of Water-Flowing Fractured Zone under the Weak Roof Strata and Fully Mechanized Caving Condition
Yan Zhang
Abstract
Yan Zhang
Abstract
The first working face production has suspend because of the great roof water inrush in Mindongyi coal mine, which has weak roof strata and mining use the fully mechanized caving method. In order to detect the height of water-flowing fractured zone, loses of drilling fluid observation method has carried on the flied test, the results showed that while the full-mechanized caving mining thickness is 7.7 m, the height of water-flowing fractured zone is 79.78 m, and the ratio of height to thickness is 10.36, meanwhile, the numerical simulation and similar material simulation have proved the test results are correct. The study enriched the domestic research fruits of the height of water flowing fractured zone, and provided technical references for Mindongyi coal mine mining.
OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The first working face production has suspend because of the great roof water inrush in Mindongyi coal mine, which has weak roof strata and mining use the fully mechanized caving method. In order to detect the height of water-flowing fractured zone, loses of drilling fluid observation method has carried on the flied test, the results showed that while the full-mechanized caving mining thickness is 7.7 m, the height of water-flowing fractured zone is 79.78 m, and the ratio of height to thickness is 10.36, meanwhile, the numerical simulation and similar material simulation have proved the test results are correct. The study enriched the domestic research fruits of the height of water flowing fractured zone, and provided technical references for Mindongyi coal mine mining.
Key concepts: Roof, Drilling, Mining engineering, Geology, Coal mining, Geotechnical engineering, Inrush current, Shaft mining