1992•Review of Scientific InstrumentsRequires access

Status of the European Synchrotron Radiation Facility insertion devices

J. Chavanne, Elia Chinchio, Marie-Ange Diot, P. Elleaume, D. Frachon, Xavier M. Maréchal, C. Mariaggi, F. Revol

Open publisher page 15 citations

Abstract

The status of development of insertion devices for the European Synchrotron Radiation Facility 6 GeV low emittance synchrotron radiation source is described. Phase I includes nine insertion devices with a magnetic field ranging from 0.4 to 1.8 T and periods from 44 to 150 mm to be commissioned in 1993. The chosen segmentation, support structure of magnetic assemblies, field measurement techniques and computational tools are described. A novel kind of helical undulator is being implemented.

About this research paper

What this paper is about

The status of development of insertion devices for the European Synchrotron Radiation Facility 6 GeV low emittance synchrotron radiation source is described. Phase I includes nine insertion devices with a magnetic field ranging from 0.4 to 1.8 T and periods from 44 to 150 mm to be commissioned in 1993. The chosen segmentation, support structure of magnetic assemblies, field measurement techniques and computational tools are described. A novel kind of helical undulator is being implemented.

Why it matters

OpenAlex reports 15 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The status of development of insertion devices for the European Synchrotron Radiation Facility 6 GeV low emittance synchrotron radiation source is described. Phase I includes nine insertion devices with a magnetic field ranging from 0.4 to 1.8 T and periods from 44 to 150 mm to be commissioned in 1993. The chosen segmentation, support structure of magnetic assemblies, field measurement techniques and computational tools are described. A novel kind of helical undulator is being implemented.

Key concepts: Undulator, Synchrotron radiation, Synchrotron, Thermal emittance, Optics, High-energy X-rays, Particle accelerator, Physics

Related papers

Back to paper searchBrowse research topicsOriginal source
Status of the European Synchrotron Radiation Facility insertion devices — Research Paper | ScholarLens