2011SPE Drilling & CompletionRequires access

Avoiding Losses in Depleted and Weak Zones by Constantly Strengthening Wellbores

Eric van Oort, J. Friedheim, Toby Pierce, J. Lee

Open publisher page 150 citations

Abstract

Summary Drilling depleted or weak zones has always been a challenge, but with the aging of fields and the desire to drill to deeper in-field plays, the situation is becoming more exacerbated. The typical problems associated with drilling these types of intervals are lost circulation, stuck pipe, and wellbore instability, resulting in significant and expensive nonproductive time (NPT) and costly remediation operations. Conventional lost-circulation remedies (e.g., pumping lost-circulation pills and squeezing) have given way to popular wellbore-strengthening solutions. Our approach to strengthening, based on beneficial manipulation of fracture- propagation pressure and continuous application of specialized wellbore-strengthening additives, has had tremendous success in reducing downhole mud losses by more than 80% in Gulf of Mexico (GOM) deepwater operations and dropping the cost of these incidents out of the top 10 contributors to NPT. This paper focuses on the various theories and approaches to wellbore strengthening and what the available field and literature data actually support. Building upon this, the approach of gaining wellbore fortification through fracture-propagation-resistance (FPR) enhancement is introduced, for which experimental results, field data, and case histories are shared. Central to our application of FPR to drill-challenging deepwater production wells is the notion of providing continuous wellbore protection through a novel and unique solids-recovery and reintroduction method that allows for drilling with high concentrations of wellbore-strengthening materials (WSMs) in the drilling fluid.

About this research paper

What this paper is about

Summary Drilling depleted or weak zones has always been a challenge, but with the aging of fields and the desire to drill to deeper in-field plays, the situation is becoming more exacerbated. The typical problems associated with drilling these types of intervals are lost circulation, stuck pipe, and wellbore instability, resulting in significant and expensive nonproductive time (NPT) and costly remediation operations. Conventional lost-circulation remedies (e.g., pumping lost-circulation pills and squeezing) have given way to popular wellbore-strengthening solutions. Our approach to strengthening, based on beneficial manipulation of fracture- propagation pressure and continuous application of specialized wellbore-strengthening additives, has had tremendous success in reducing downhole mud losses by more than 80% in Gulf of Mexico (GOM) deepwater operations and dropping the cost of these incidents out of the top 10 contributors to NPT. This paper focuses on the various theories and approaches to wellbore strengthening and what the available field and literature data actually support. Building upon this, the approach of gaining wellbore fortification through fracture-propagation-resistance (FPR) enhancement is introduced, for which experimental results, field data, and case histories are shared. Central to our application of FPR to drill-challenging deepwater production wells is the notion of providing continuous wellbore protection through a novel and unique solids-recovery and reintroduction method that allows for drilling with high concentrations of wellbore-strengthening materials (WSMs) in the drilling fluid.

Why it matters

OpenAlex reports 150 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Summary Drilling depleted or weak zones has always been a challenge, but with the aging of fields and the desire to drill to deeper in-field plays, the situation is becoming more exacerbated. The typical problems associated with drilling these types of intervals are lost circulation, stuck pipe, and wellbore instability, resulting in significant and expensive nonproductive time (NPT) and costly remediation operations. Conventional lost-circulation remedies (e.g., pumping lost-circulation pills and squeezing) have given way to popular wellbore-strengthening solutions. Our approach to strengthening, based on beneficial manipulation of fracture- propagation pressure and continuous application of specialized wellbore-strengthening additives, has had tremendous success in reducing downhole mud losses by more than 80% in Gulf of Mexico (GOM) deepwater operations and dropping the cost of these incidents out of the top 10 contributors to NPT. This paper focuses on the various theories and approaches to wellbore strengthening and what the available field and literature data actually support. Building upon this, the approach of gaining wellbore fortification through fracture-propagation-resistance (FPR) enhancement is introduced, for which experimental results, field data, and case histories are shared. Central to our application of FPR to drill-challenging deepwater production wells is the notion of providing continuous wellbore protection through a novel and unique solids-recovery and reintroduction method that allows for drilling with high concentrations of wellbore-strengthening materials (WSMs) in the drilling fluid.

Key concepts: Wellbore, Lost circulation, Underbalanced drilling, Petroleum engineering, Drilling, Drill pipe, Drilling fluid, Drill

Related papers

Back to paper searchBrowse research topicsOriginal source
Avoiding Losses in Depleted and Weak Zones by Constantly Strengthening Wellbores — Research Paper | ScholarLens