Mining Design Optimization Research on the Northern Section of 8 Coal Seam in West No.1 Mining Area in Pansan Mine
Hua Wang, Chang Cai Fang, Yi Guo Shu, Li Xin Yang, De Fu Jiang, Li Jie Huo
Abstract
Hua Wang, Chang Cai Fang, Yi Guo Shu, Li Xin Yang, De Fu Jiang, Li Jie Huo
Abstract
Water in Lower Aquifer of Quaternary is one of the mine water inrush sources during working faces being mining in the Northern Section of 8 Coal Seam in West No.1 Mining Area. Water flowing fractured zone, F1 fault, F22-a fault and F48 fault are main water-conducting channels in mining. According to the analysis of geology and hydrographical geology of the mine area, and combined with “Water Prevention Regulation of Coal Mines” and “Regulations of pillar leaving and coal mining under building, water, railway and mail shaft and tunnel”, stope layout was optimized, i.e. the minimum waterproof coal(rock) pillar between working face and Lower Aquifer Quaternary is 70 meter, the waterproof coal(rock) pillar between working face and F1 fault, F22-a fault, F48 fault is 70~95 meter, 70~75 meter, 80~90 meter respectively. Each shallow waterproof coal (rock) pillar of fault is narrow at the top and tends to increasingly widen at the bottom.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
Water in Lower Aquifer of Quaternary is one of the mine water inrush sources during working faces being mining in the Northern Section of 8 Coal Seam in West No.1 Mining Area. Water flowing fractured zone, F1 fault, F22-a fault and F48 fault are main water-conducting channels in mining. According to the analysis of geology and hydrographical geology of the mine area, and combined with “Water Prevention Regulation of Coal Mines” and “Regulations of pillar leaving and coal mining under building, water, railway and mail shaft and tunnel”, stope layout was optimized, i.e. the minimum waterproof coal(rock) pillar between working face and Lower Aquifer Quaternary is 70 meter, the waterproof coal(rock) pillar between working face and F1 fault, F22-a fault, F48 fault is 70~95 meter, 70~75 meter, 80~90 meter respectively. Each shallow waterproof coal (rock) pillar of fault is narrow at the top and tends to increasingly widen at the bottom.
Key concepts: Aquifer, Coal mining, Coal, Mining engineering, Fault (geology), Inrush current, Problems in coal mining, Metre