2012•Ironmaking & Steelmaking Processes Products and ApplicationsRequires access

Influence of ladle slag additions on BOF process performance

Anders Dahlin, Anders Tilliander, Johan Eriksson, Pär G. Jönsson

Open publisher page 16 citations

Abstract

A plant trial has been performed, with recycling of ladle slag to the LD converter at SSAB EMEA, Luleå, Sweden. The effect of ladle slag addition on the slag and steel composition, together with the slag weight, was investigated with sampling both during the blow and at blow end. The addition of ladle slag resulted in an increase in slag weight between 1 and 2 t throughout the blow and an increase of 3 wt-% in the slag Al2O3 content. This indicated that the ladle slag melted during the initial stages of the blow and enhanced the early slag formation. Lime additions were reduced with 3·5 kg t−1 liquid steel without drawbacks on the phosphorus or sulphur refining. Heats with added ladle slag had an increase in blowing time with ∼4% and an increased tendency for slopping. However, this can be handled by different lance and addition programmes.

About this research paper

What this paper is about

A plant trial has been performed, with recycling of ladle slag to the LD converter at SSAB EMEA, Luleå, Sweden. The effect of ladle slag addition on the slag and steel composition, together with the slag weight, was investigated with sampling both during the blow and at blow end. The addition of ladle slag resulted in an increase in slag weight between 1 and 2 t throughout the blow and an increase of 3 wt-% in the slag Al2O3 content. This indicated that the ladle slag melted during the initial stages of the blow and enhanced the early slag formation. Lime additions were reduced with 3·5 kg t−1 liquid steel without drawbacks on the phosphorus or sulphur refining. Heats with added ladle slag had an increase in blowing time with ∼4% and an increased tendency for slopping. However, this can be handled by different lance and addition programmes.

Why it matters

OpenAlex reports 16 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

A plant trial has been performed, with recycling of ladle slag to the LD converter at SSAB EMEA, Luleå, Sweden. The effect of ladle slag addition on the slag and steel composition, together with the slag weight, was investigated with sampling both during the blow and at blow end. The addition of ladle slag resulted in an increase in slag weight between 1 and 2 t throughout the blow and an increase of 3 wt-% in the slag Al2O3 content. This indicated that the ladle slag melted during the initial stages of the blow and enhanced the early slag formation. Lime additions were reduced with 3·5 kg t−1 liquid steel without drawbacks on the phosphorus or sulphur refining. Heats with added ladle slag had an increase in blowing time with ∼4% and an increased tendency for slopping. However, this can be handled by different lance and addition programmes.

Key concepts: Ladle, Slag (welding), Metallurgy, Lime, Refining (metallurgy), Materials science, Waste management, Engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Influence of ladle slag additions on BOF process performance — Research Paper | ScholarLens