2012Advanced materials researchOpen access

Removal of COD from Piggery Wastewater Using a Lab-Scale UASB Reactor

Fei Yan, Jin Long Zuo, Tian Qiu, Xuming Wang

Open full text 0 citations

Abstract

It took 55 days to start up a lab-scale upflow anaerobic sludge blanket (UASB) reactor at ambient temperature 27-28 oC by using the synthetic wastewater, and piggery wastewater was used as the influent after the reactor start-up. From day 120 onwards, COD removal efficiency maintained in the range of 85% to 95% with 6.79-9.66 kg COD/ (m3•d) of volume loading, and the effluent COD concentration ranged between 400 mg/L and 600 mg/L. Granular sludge formation was observed in the reactor after 40-day operation, and the sludge diameter reached 2-4 mm in the 120 day-old reactor. The pH changes in the influent had little influence on COD removal from piggery wastewater using the UASB reactor.

About this research paper

What this paper is about

It took 55 days to start up a lab-scale upflow anaerobic sludge blanket (UASB) reactor at ambient temperature 27-28 oC by using the synthetic wastewater, and piggery wastewater was used as the influent after the reactor start-up. From day 120 onwards, COD removal efficiency maintained in the range of 85% to 95% with 6.79-9.66 kg COD/ (m3•d) of volume loading, and the effluent COD concentration ranged between 400 mg/L and 600 mg/L. Granular sludge formation was observed in the reactor after 40-day operation, and the sludge diameter reached 2-4 mm in the 120 day-old reactor. The pH changes in the influent had little influence on COD removal from piggery wastewater using the UASB reactor.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

It took 55 days to start up a lab-scale upflow anaerobic sludge blanket (UASB) reactor at ambient temperature 27-28 oC by using the synthetic wastewater, and piggery wastewater was used as the influent after the reactor start-up. From day 120 onwards, COD removal efficiency maintained in the range of 85% to 95% with 6.79-9.66 kg COD/ (m3•d) of volume loading, and the effluent COD concentration ranged between 400 mg/L and 600 mg/L. Granular sludge formation was observed in the reactor after 40-day operation, and the sludge diameter reached 2-4 mm in the 120 day-old reactor. The pH changes in the influent had little influence on COD removal from piggery wastewater using the UASB reactor.

Key concepts: Effluent, Wastewater, Blanket, Pulp and paper industry, Environmental science, Bioreactor, Waste management, Volume (thermodynamics)

Related papers

Back to paper searchBrowse research topicsOriginal source
Removal of COD from Piggery Wastewater Using a Lab-Scale UASB Reactor — Research Paper | ScholarLens