Fire Safety Management: Replacement Procedure of Fire Doors for an Existing Building

W. K. Chow

Open publisher page 2 citations

Abstract

The replacement procedure of fire doors in an existing building is criticized. There were nine vertical vents left open for over ten days in each lobby with two fire doors before fixing glass panels and exit signs. This arrangement is demonstrated to be not acceptable by studying the consequence of a fire in an office with the two-layer zone model CFAST. Smoke will spread into the other parts of the building quickly. Disaster similar to a previous local big fire during building refurbishment might be resulted. A better planning and supervision schedule of replacing fire doors should be provided by the facility manager.

About this research paper

What this paper is about

The replacement procedure of fire doors in an existing building is criticized. There were nine vertical vents left open for over ten days in each lobby with two fire doors before fixing glass panels and exit signs. This arrangement is demonstrated to be not acceptable by studying the consequence of a fire in an office with the two-layer zone model CFAST. Smoke will spread into the other parts of the building quickly. Disaster similar to a previous local big fire during building refurbishment might be resulted. A better planning and supervision schedule of replacing fire doors should be provided by the facility manager.

Why it matters

OpenAlex reports 2 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The replacement procedure of fire doors in an existing building is criticized. There were nine vertical vents left open for over ten days in each lobby with two fire doors before fixing glass panels and exit signs. This arrangement is demonstrated to be not acceptable by studying the consequence of a fire in an office with the two-layer zone model CFAST. Smoke will spread into the other parts of the building quickly. Disaster similar to a previous local big fire during building refurbishment might be resulted. A better planning and supervision schedule of replacing fire doors should be provided by the facility manager.

Key concepts: Doors, Fire protection, Fire safety, Schedule, Smoke, Active fire protection, Engineering, Architectural engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Fire Safety Management: Replacement Procedure of Fire Doors for an Existing Building — Research Paper | ScholarLens