2012Greenhouse Gases Science and TechnologyRequires access

Model verification and evaluation of the rich‐split process modification at an Australian‐based post combustion CO2 capture pilot plant

Ashleigh Cousins, Aaron Cottrell, Anthony Lawson, Sanger Huang, Paul H.M. Feron

Open publisher page 127 citations

Abstract

Abstract The CSIRO is involved in three CO2 capture pilot plants operating at different coal‐fired power stations throughout Australia. The most recently completed of these is the Tarong CO2 capture pilot plant located at Tarong power station, Nanango, Queensland. The first phase of the experimental program with this pilot plant included operation with monoethanolamine (MEA). This involved parametric studies, process modifications, and finally implementation of 24 h operation. Operation of the pilot plant has shown MEA to be effective in capturing CO2 from the flue gas from Tarong Power Station. CO2 capture efficiencies of up to 94%, and regeneration energies as low as 3.6 MJ/kgCO2 have been achieved. The design of the pilot plant was completed using a commercially available process modeling software tool. Results obtained from the pilot plant were then compared to the model predictions including temperature, solvent CO2 loading, and CO2 gas concentration profiles through the absorber column. A good match has been obtained between the modeling and pilot plant data, verifying the software can be used to predict the performance of the pilot plant when operating on MEA. During this project, the rich‐split process modification was also evaluated. The results suggest that the rich‐split modification can achieve some reduction in reboiler duty and a considerable reduction in the condenser duty. The amount of reduction is dependent on plant design, particularly the efficiency of the lean/rich heat exchanger. © 2012 Society of Chemical Industry and John Wiley & Sons, Ltd

About this research paper

What this paper is about

Abstract The CSIRO is involved in three CO2 capture pilot plants operating at different coal‐fired power stations throughout Australia. The most recently completed of these is the Tarong CO2 capture pilot plant located at Tarong power station, Nanango, Queensland. The first phase of the experimental program with this pilot plant included operation with monoethanolamine (MEA). This involved parametric studies, process modifications, and finally implementation of 24 h operation. Operation of the pilot plant has shown MEA to be effective in capturing CO2 from the flue gas from Tarong Power Station. CO2 capture efficiencies of up to 94%, and regeneration energies as low as 3.6 MJ/kgCO2 have been achieved. The design of the pilot plant was completed using a commercially available process modeling software tool. Results obtained from the pilot plant were then compared to the model predictions including temperature, solvent CO2 loading, and CO2 gas concentration profiles through the absorber column. A good match has been obtained between the modeling and pilot plant data, verifying the software can be used to predict the performance of the pilot plant when operating on MEA. During this project, the rich‐split process modification was also evaluated. The results suggest that the rich‐split modification can achieve some reduction in reboiler duty and a considerable reduction in the condenser duty. The amount of reduction is dependent on plant design, particularly the efficiency of the lean/rich heat exchanger. © 2012 Society of Chemical Industry and John Wiley & Sons, Ltd

Why it matters

OpenAlex reports 127 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Abstract The CSIRO is involved in three CO2 capture pilot plants operating at different coal‐fired power stations throughout Australia. The most recently completed of these is the Tarong CO2 capture pilot plant located at Tarong power station, Nanango, Queensland. The first phase of the experimental program with this pilot plant included operation with monoethanolamine (MEA). This involved parametric studies, process modifications, and finally implementation of 24 h operation. Operation of the pilot plant has shown MEA to be effective in capturing CO2 from the flue gas from Tarong Power Station. CO2 capture efficiencies of up to 94%, and regeneration energies as low as 3.6 MJ/kgCO2 have been achieved. The design of the pilot plant was completed using a commercially available process modeling software tool. Results obtained from the pilot plant were then compared to the model predictions including temperature, solvent CO2 loading, and CO2 gas concentration profiles through the absorber column. A good match has been obtained between the modeling and pilot plant data, verifying the software can be used to predict the performance of the pilot plant when operating on MEA. During this project, the rich‐split process modification was also evaluated. The results suggest that the rich‐split modification can achieve some reduction in reboiler duty and a considerable reduction in the condenser duty. The amount of reduction is dependent on plant design, particularly the efficiency of the lean/rich heat exchanger. © 2012 Society of Chemical Industry and John Wiley & Sons, Ltd

Key concepts: Pilot plant, Reboiler, Power station, Flue gas, Condenser (optics), Process engineering, Process (computing), Process simulation

Related papers

Back to paper searchBrowse research topicsOriginal source
Model verification and evaluation of the rich‐split process modification at an Australian‐based post combustion CO2 capture pilot plant — Research Paper | ScholarLens