Strengthening of the West Gate Bridge Approach Span, Melbourne

Tim Gosbell

Open publisher page 5 citations

Abstract

The West Gate Bridge opened to traffic in 1978 linking Melbourne to the western industrial and residential areas. Known worldwide because of the tragic collapse of the main steel spans, the approach spans are receiving a new lease of life. The construction of additional approach lanes has lead to the need for an additional traffic lane on the existing bridge. As it wasn’t originally designed for more than 8 traffic lanes a design check was carried out comparing design loads against current legal vehicle loads. To avoid over stressing the structure the bridges approach structures had to be strengthened.

About this research paper

What this paper is about

The West Gate Bridge opened to traffic in 1978 linking Melbourne to the western industrial and residential areas. Known worldwide because of the tragic collapse of the main steel spans, the approach spans are receiving a new lease of life. The construction of additional approach lanes has lead to the need for an additional traffic lane on the existing bridge. As it wasn’t originally designed for more than 8 traffic lanes a design check was carried out comparing design loads against current legal vehicle loads. To avoid over stressing the structure the bridges approach structures had to be strengthened.

Why it matters

OpenAlex reports 5 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The West Gate Bridge opened to traffic in 1978 linking Melbourne to the western industrial and residential areas. Known worldwide because of the tragic collapse of the main steel spans, the approach spans are receiving a new lease of life. The construction of additional approach lanes has lead to the need for an additional traffic lane on the existing bridge. As it wasn’t originally designed for more than 8 traffic lanes a design check was carried out comparing design loads against current legal vehicle loads. To avoid over stressing the structure the bridges approach structures had to be strengthened.

Key concepts: Bridge (graph theory), Engineering, Span (engineering), Lease, Civil engineering, Forensic engineering, Heavy traffic, Transport engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Strengthening of the West Gate Bridge Approach Span, Melbourne — Research Paper | ScholarLens