Strengthening of the West Gate Bridge Approach Span, Melbourne
Tim Gosbell
Abstract
Tim Gosbell
Abstract
The West Gate Bridge opened to traffic in 1978 linking Melbourne to the western industrial and residential areas. Known worldwide because of the tragic collapse of the main steel spans, the approach spans are receiving a new lease of life. The construction of additional approach lanes has lead to the need for an additional traffic lane on the existing bridge. As it wasn’t originally designed for more than 8 traffic lanes a design check was carried out comparing design loads against current legal vehicle loads. To avoid over stressing the structure the bridges approach structures had to be strengthened.
OpenAlex reports 5 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The West Gate Bridge opened to traffic in 1978 linking Melbourne to the western industrial and residential areas. Known worldwide because of the tragic collapse of the main steel spans, the approach spans are receiving a new lease of life. The construction of additional approach lanes has lead to the need for an additional traffic lane on the existing bridge. As it wasn’t originally designed for more than 8 traffic lanes a design check was carried out comparing design loads against current legal vehicle loads. To avoid over stressing the structure the bridges approach structures had to be strengthened.
Key concepts: Bridge (graph theory), Engineering, Span (engineering), Lease, Civil engineering, Forensic engineering, Heavy traffic, Transport engineering