Centrifugal model tests were performed to investigate the effectiveness of settlement control using geogrid-reinforced pile-supported embankments for high-speed railways on collapsible loess. First, the acceptability of using remoulded loess to simulate the behaviour of undisturbed collapsible loess in wetting test was examined in centrifuge tests. Then, the settlement of geogrid-reinforced pile-supported embankments under different conditions was investigated using remoulded loess. Experiments results showed that the collapse deformation process of remoulded and undisturbed collapsible loess can be divided into three stages with respect to time. The settlement of embankment built on collapsible loess foundation without improvement does not meet the post-construction settlement constraint for embankment of ballast track high-speed railways. Use of rigid piles, with or without caps, can significantly reduce embankment settlement and the rate of post-construction settlement. It was also observed that the negative skin friction developed in the piles varies with pile spacing and the pile configurations.

About this research paper

What this paper is about

Centrifugal model tests were performed to investigate the effectiveness of settlement control using geogrid-reinforced pile-supported embankments for high-speed railways on collapsible loess. First, the acceptability of using remoulded loess to simulate the behaviour of undisturbed collapsible loess in wetting test was examined in centrifuge tests. Then, the settlement of geogrid-reinforced pile-supported embankments under different conditions was investigated using remoulded loess. Experiments results showed that the collapse deformation process of remoulded and undisturbed collapsible loess can be divided into three stages with respect to time. The settlement of embankment built on collapsible loess foundation without improvement does not meet the post-construction settlement constraint for embankment of ballast track high-speed railways. Use of rigid piles, with or without caps, can significantly reduce embankment settlement and the rate of post-construction settlement. It was also observed that the negative skin friction developed in the piles varies with pile spacing and the pile configurations.

Why it matters

OpenAlex reports 24 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Centrifugal model tests were performed to investigate the effectiveness of settlement control using geogrid-reinforced pile-supported embankments for high-speed railways on collapsible loess. First, the acceptability of using remoulded loess to simulate the behaviour of undisturbed collapsible loess in wetting test was examined in centrifuge tests. Then, the settlement of geogrid-reinforced pile-supported embankments under different conditions was investigated using remoulded loess. Experiments results showed that the collapse deformation process of remoulded and undisturbed collapsible loess can be divided into three stages with respect to time. The settlement of embankment built on collapsible loess foundation without improvement does not meet the post-construction settlement constraint for embankment of ballast track high-speed railways. Use of rigid piles, with or without caps, can significantly reduce embankment settlement and the rate of post-construction settlement. It was also observed that the negative skin friction developed in the piles varies with pile spacing and the pile configurations.

Key concepts: Geogrid, Loess, Geotechnical engineering, Settlement (finance), Pile, Centrifuge, Levee, Ballast