Float-Over Analysis for World’s Largest Float-Over Barge

Job Bokhorst, O. Willemse, Richard Zoontjes

Open publisher page 4 citations

Abstract

Heerema Marine Contractors has recently converted its launch barge H-851 into a float-over barge able to install ultra heavy topsides with weights up to 38,000 mT. With a length of 260 m, width of 63 m and height of 15 m, the H-851 is the world’s largest float-over barge. By narrowing the bow section to 42 m, the required sub-structure slot to fit the barge is reduced significantly decreasing the size of sub-structure and topsides hence optimizing platform weight and cost. Initially the sheer size of the H-851 was thought to result in high forces on topsides, sub-structure and interface systems during installation. However, engineering analyses show that by choosing the appropriate float-over equipment, loads can be kept below limits which are considered conceivable for the platform design. Special measures are taken to minimize the exposure during load transfer by equipping the barge with a high capacity ballast system. As with all vessels with large displacement, maneuvering before and after float-over requires thorough planning and risk identification during the engineering stage. This paper discusses the critical phases during the float-over operations and demonstrates that the platform design can be optimized by considering float-over equipment and operational limits in an early stage of the project. The approach for extensive hydrodynamic analyses is discussed which have matured over recent times thanks to available software tools and extensive research with respect to comparison with model tests and full scale experience.

About this research paper

What this paper is about

Heerema Marine Contractors has recently converted its launch barge H-851 into a float-over barge able to install ultra heavy topsides with weights up to 38,000 mT. With a length of 260 m, width of 63 m and height of 15 m, the H-851 is the world’s largest float-over barge. By narrowing the bow section to 42 m, the required sub-structure slot to fit the barge is reduced significantly decreasing the size of sub-structure and topsides hence optimizing platform weight and cost. Initially the sheer size of the H-851 was thought to result in high forces on topsides, sub-structure and interface systems during installation. However, engineering analyses show that by choosing the appropriate float-over equipment, loads can be kept below limits which are considered conceivable for the platform design. Special measures are taken to minimize the exposure during load transfer by equipping the barge with a high capacity ballast system. As with all vessels with large displacement, maneuvering before and after float-over requires thorough planning and risk identification during the engineering stage. This paper discusses the critical phases during the float-over operations and demonstrates that the platform design can be optimized by considering float-over equipment and operational limits in an early stage of the project. The approach for extensive hydrodynamic analyses is discussed which have matured over recent times thanks to available software tools and extensive research with respect to comparison with model tests and full scale experience.

Why it matters

OpenAlex reports 4 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Heerema Marine Contractors has recently converted its launch barge H-851 into a float-over barge able to install ultra heavy topsides with weights up to 38,000 mT. With a length of 260 m, width of 63 m and height of 15 m, the H-851 is the world’s largest float-over barge. By narrowing the bow section to 42 m, the required sub-structure slot to fit the barge is reduced significantly decreasing the size of sub-structure and topsides hence optimizing platform weight and cost. Initially the sheer size of the H-851 was thought to result in high forces on topsides, sub-structure and interface systems during installation. However, engineering analyses show that by choosing the appropriate float-over equipment, loads can be kept below limits which are considered conceivable for the platform design. Special measures are taken to minimize the exposure during load transfer by equipping the barge with a high capacity ballast system. As with all vessels with large displacement, maneuvering before and after float-over requires thorough planning and risk identification during the engineering stage. This paper discusses the critical phases during the float-over operations and demonstrates that the platform design can be optimized by considering float-over equipment and operational limits in an early stage of the project. The approach for extensive hydrodynamic analyses is discussed which have matured over recent times thanks to available software tools and extensive research with respect to comparison with model tests and full scale experience.

Key concepts: BARGE, Float (project management), Marine engineering, Engineering, Ballast, Computer science, Environmental science, Electrical engineering

Related papers

Back to paper searchBrowse research topicsOriginal source
Float-Over Analysis for World’s Largest Float-Over Barge — Research Paper | ScholarLens