2013Applied Mechanics and MaterialsRequires access

Flow and Sediment Conditions for the Yellow River Estuary Balance

Shou Bing Yu, Kai Rong Wang, Wan Zhan Wang

Open publisher page 0 citations

Abstract

Multi-object application and water and sediment regulation of the Xiaolangdi Reservoir since 2001 have changed the flow and sediment conditions entering the Lower Reaches of Yellow River and the Estuary. Field flow and sediment data at Lijin Hydrological Station and river cross section elevation data downstream from Lijin Section during 2001~2010 have shown that the Estuary have been in a state of little scouring. The 2D mathematical model has been used to study the flow and sediment conditions for the Yellow River Estuary balance. The conclusions have arrived at that total annual water volume is 196 × 108 m3, total annual sediment volume is 1.40~1.70×108 t, coarse sediment concentration is 3kg/m3.

About this research paper

What this paper is about

Multi-object application and water and sediment regulation of the Xiaolangdi Reservoir since 2001 have changed the flow and sediment conditions entering the Lower Reaches of Yellow River and the Estuary. Field flow and sediment data at Lijin Hydrological Station and river cross section elevation data downstream from Lijin Section during 2001~2010 have shown that the Estuary have been in a state of little scouring. The 2D mathematical model has been used to study the flow and sediment conditions for the Yellow River Estuary balance. The conclusions have arrived at that total annual water volume is 196 × 108 m3, total annual sediment volume is 1.40~1.70×108 t, coarse sediment concentration is 3kg/m3.

Why it matters

A significance statement is not available in the OpenAlex record.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

Multi-object application and water and sediment regulation of the Xiaolangdi Reservoir since 2001 have changed the flow and sediment conditions entering the Lower Reaches of Yellow River and the Estuary. Field flow and sediment data at Lijin Hydrological Station and river cross section elevation data downstream from Lijin Section during 2001~2010 have shown that the Estuary have been in a state of little scouring. The 2D mathematical model has been used to study the flow and sediment conditions for the Yellow River Estuary balance. The conclusions have arrived at that total annual water volume is 196 × 108 m3, total annual sediment volume is 1.40~1.70×108 t, coarse sediment concentration is 3kg/m3.

Key concepts: Estuary, Sediment, Hydrology (agriculture), Sedimentary budget, Flow (mathematics), Environmental science, Streamflow, Volume (thermodynamics)

Related papers

Back to paper searchBrowse research topicsOriginal source
Flow and Sediment Conditions for the Yellow River Estuary Balance — Research Paper | ScholarLens