Canadian Arctic LNG pilot project detailed
Don Wolcott
Abstract
Don Wolcott
Abstract
A discussion covers Petro-Canada Ltd.'s and Alberta Gas Trunk Line Co. Ltd.'s Melville Island LNG pilot project covers the proposed shipping route from Bridport Inlet to an east coast terminal; the severe environmental conditions, e.g., the strong winds (as high as 75 mph); ice conditions in Bridport Inlet; estimates of gas reserves which now total 12.8 trillion cu ft of likely marketable gas, including 5.4 trillion cu ft in the Drake field; drilling and gas-gathering plans for Drake field; the planned 275 million cu ft/day, 100 mi, 22 in. pipeline from Drake Point to Bridport Inlet; considerations for building the barge-mounted terminal on the shore of Bridport Inlet; the liquefaction plant which will have a 250 million cu ft/day output and will be designed to operate 345 days/yr; use of cooling water effluent from the LNG plant to reduce ice thickness in the berthing area; possible design of the 200,000 cu m LNG storage area; and the icebreaking LNG carriers which operate year-round and whose design will be based on a computer-simulation program.
A significance statement is not available in the OpenAlex record.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
A discussion covers Petro-Canada Ltd.'s and Alberta Gas Trunk Line Co. Ltd.'s Melville Island LNG pilot project covers the proposed shipping route from Bridport Inlet to an east coast terminal; the severe environmental conditions, e.g., the strong winds (as high as 75 mph); ice conditions in Bridport Inlet; estimates of gas reserves which now total 12.8 trillion cu ft of likely marketable gas, including 5.4 trillion cu ft in the Drake field; drilling and gas-gathering plans for Drake field; the planned 275 million cu ft/day, 100 mi, 22 in. pipeline from Drake Point to Bridport Inlet; considerations for building the barge-mounted terminal on the shore of Bridport Inlet; the liquefaction plant which will have a 250 million cu ft/day output and will be designed to operate 345 days/yr; use of cooling water effluent from the LNG plant to reduce ice thickness in the berthing area; possible design of the 200,000 cu m LNG storage area; and the icebreaking LNG carriers which operate year-round and whose design will be based on a computer-simulation program.
Key concepts: Inlet, Liquefied natural gas, Environmental science, Shore, Natural gas, Natural gas field, Drilling, Arctic