1994Management ScienceRequires access

Safety Stock versus Safety Time in MRP Controlled Production Systems

John A. Buzacott, J. George Shanthikumar

Open publisher page 154 citations

Abstract

The two management set parameters which determine the performance of a material requirements planning (MRP) system are the lead time and the safety stock. The appropriate values of these parameters are influenced by the accuracy of forecasts over the lead time, the variability of processing time and the degree of congestion, together with the costs of inventory and shortages. These influences are explored using stochastic models of a single stage manufacturing system for which work release is controlled using MRP. The major conclusion is that safety time is usually only preferable to safety stock when it is possible to make accurate forecasts of future required shipments over the lead time, otherwise safety stock is more robust in coping with changes in customer requirements in the lead time or with fluctuations in forecasts of lead time demand.

About this research paper

What this paper is about

The two management set parameters which determine the performance of a material requirements planning (MRP) system are the lead time and the safety stock. The appropriate values of these parameters are influenced by the accuracy of forecasts over the lead time, the variability of processing time and the degree of congestion, together with the costs of inventory and shortages. These influences are explored using stochastic models of a single stage manufacturing system for which work release is controlled using MRP. The major conclusion is that safety time is usually only preferable to safety stock when it is possible to make accurate forecasts of future required shipments over the lead time, otherwise safety stock is more robust in coping with changes in customer requirements in the lead time or with fluctuations in forecasts of lead time demand.

Why it matters

OpenAlex reports 154 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The two management set parameters which determine the performance of a material requirements planning (MRP) system are the lead time and the safety stock. The appropriate values of these parameters are influenced by the accuracy of forecasts over the lead time, the variability of processing time and the degree of congestion, together with the costs of inventory and shortages. These influences are explored using stochastic models of a single stage manufacturing system for which work release is controlled using MRP. The major conclusion is that safety time is usually only preferable to safety stock when it is possible to make accurate forecasts of future required shipments over the lead time, otherwise safety stock is more robust in coping with changes in customer requirements in the lead time or with fluctuations in forecasts of lead time demand.

Key concepts: Safety stock, Lead time, Stock (firearms), Economic shortage, Material requirements planning, Computer science, Operations research, Inventory management