1988•Geophysical Research LettersRequires access

Drilling summary, Cajon Pass Scientific Drilling Project: Phase I

A. Percy Wicklund, Robert S. Andrews, Robert James Johnson

Open publisher page 4 citations

Abstract

The drill hole for the Cajon Pass Scientific Drilling Project was designed uniquely to accomplish specific science experiments. Special consideration was given to drilling practices for hole size, spot coring, deviation from the vertical, chemical and physical properties of the drilling fluids and pipe lubricants, monitoring mud logging and drilling parameters, and procedures for handling of cores and cuttings samples. Phase I of drilling reached a depth of 2115 m.

About this research paper

What this paper is about

The drill hole for the Cajon Pass Scientific Drilling Project was designed uniquely to accomplish specific science experiments. Special consideration was given to drilling practices for hole size, spot coring, deviation from the vertical, chemical and physical properties of the drilling fluids and pipe lubricants, monitoring mud logging and drilling parameters, and procedures for handling of cores and cuttings samples. Phase I of drilling reached a depth of 2115 m.

Why it matters

OpenAlex reports 4 citations for this work. Citation counts describe recorded attention and do not establish research quality.

Key contribution

A contribution statement is not available in the OpenAlex record.

Method / approach

Method details are not available in the OpenAlex metadata.

Main findings

Findings are not separately available in the OpenAlex metadata.

Limitations

Limitations are not available in the OpenAlex metadata.

Applications

Application details are not available in the OpenAlex metadata.

Available abstract

The drill hole for the Cajon Pass Scientific Drilling Project was designed uniquely to accomplish specific science experiments. Special consideration was given to drilling practices for hole size, spot coring, deviation from the vertical, chemical and physical properties of the drilling fluids and pipe lubricants, monitoring mud logging and drilling parameters, and procedures for handling of cores and cuttings samples. Phase I of drilling reached a depth of 2115 m.

Key concepts: Coring, Scientific drilling, Drilling, Drill, Measurement while drilling, Petroleum engineering, Geology, Mud logging

Related papers

Back to paper searchBrowse research topicsOriginal source
Drilling summary, Cajon Pass Scientific Drilling Project: Phase I — Research Paper | ScholarLens