Tension field action behavior in the hybrid steel girders for Ohio approach spans of Blennerhassett Island Bridge
Faheem Ahmad, Nasser Zoubi
Abstract
Faheem Ahmad, Nasser Zoubi
Abstract
The proposed Blennerhassett Island Bridge crosses the Ohio River and historical Blennerhassett Island connecting Wood County, West Virginia to Washington County, Ohio. The hybrid steel girders for the Ohio approach spans have span length of 52.1 m, 5
OpenAlex reports 3 citations for this work. Citation counts describe recorded attention and do not establish research quality.
A contribution statement is not available in the OpenAlex record.
Method details are not available in the OpenAlex metadata.
Findings are not separately available in the OpenAlex metadata.
Limitations are not available in the OpenAlex metadata.
Application details are not available in the OpenAlex metadata.
The proposed Blennerhassett Island Bridge crosses the Ohio River and historical Blennerhassett Island connecting Wood County, West Virginia to Washington County, Ohio. The hybrid steel girders for the Ohio approach spans have span length of 52.1 m, 5
Key concepts: Bridge (graph theory), Girder, Engineering, Structural engineering, Tension (geology), Forensic engineering, Action (physics), Field (mathematics)